[00:00:02]
[CALL TO ORDER ]
JENNIFER, WOULD YOU CALL ROLL, PLEASE? THANK YOU, MAYOR.MAYOR BOEHM IS PRESENT AND PRESIDING.
[APPROVE MINUTES ]
MOTION BY DAN. SECOND BY JULIE.ALL IN FAVOR? ANY OPPOSED? MINUTES ARE APPROVED. JENNIFER MODIFICATIONS THIS EVENING? NONE THIS EVENING.
[PROCLAMATIONS ]
I'M GOING TO ASK THAT SUSAN ANGELOU, WE HOPE YOU'RE RIGHT IN THE FRONT ROW ALREADY.I'LL USE THIS ONE IF IT'S OKAY, AND THEN I'LL JUST USE THIS ONE, I THINK.
GREAT. HOW ARE YOU TONIGHT? GOOD. HOW ARE YOU? GOOD.
I'M GOING TO READ A PROCLAMATION, THEN WE'RE GOING TO TAKE PICTURES.
AWESOME. OKAY. BUT I HAVE TO HAVE IT [LAUGHTER] BECAUSE I DIDN'T I DIDN'T MEMORIZE THAT ONE.
WHEREAS DIAPER NEED THE CONDITION OF NOT HAVING A SUFFICIENT SUPPLY OF CLEAN DIAPERS TO KEEP BABIES AND TODDLERS CLEAN, DRY AND HEALTHY CAN ADVERSELY AFFECT THEIR HEALTH AND WELL-BEING. WELL-BEING.
AND WHEREAS, NATIONAL SURVEYS AND RESEARCH STUDIES REPORT THAT 47% OF FAMILIES WITH YOUNG CHILDREN STRUGGLE TO AFFORD DIAPERS AND 48% OF FAMILIES DELAY CHANGING A DIAPER TO THE EXTENT OF AVAILABLE SUPPLY.
AND WHEREAS, DAILY OR WEEKLY SUPPLY OF DIAPERS IS GENERALLY A REQUIREMENT TO PARTICIPATE IN CHILD CARE PROGRAMS AND EARLY EDUCATION PROGRAMS THAT ENABLE CHILDREN TO THRIVE AND PARENTS TO WORK.
AND WHEREAS, WITHOUT ENOUGH DIAPERS, INFECTIONS AND HEALTH PROBLEMS MAY REQUIRE MEDICAL ATTENTION, RESULTING IN MEDICAL COSTS AND PARENTS MAY BE PREVENTED FROM ACCESSING CHILDCARE NEEDED, THEREBY DESTABILIZING THE FAMILY'S ECONOMIC PROSPECTS AND WELL-BEING.
AND WHEREAS, DIAPER NEED IS A PUBLIC HEALTH ISSUE AND ADDRESSING IT CAN LEAD TO ECONOMIC OPPORTUNITY FOR THE FAMILIES AND COMMUNITIES AND IMPROVED HEALTH FOR CHILDREN, THUS ENSURING ALL CHILDREN AND FAMILIES HAVE ACCESS TO THE BASIC NECESSITIES REQUIRED TO THRIVE AND REACH THEIR FULL POTENTIAL.
NOW, THEREFORE, I, MICHAEL BOEHM, THE MAYOR OF THE CITY OF LENEXA, DO HEREBY PROCLAIM THE WEEK OF SEPTEMBER 18TH THROUGH THE 24TH AS NATIONAL DIAPER NEED AWARENESS WEEK, AND I'VE SIGNED THAT THIS EVENING.
ANGELA. OH, YOU'RE THE YOU'RE THE PHOTOGRAPHER TONIGHT.
WE HAVE SOME STAGGERING NEW STATISTICS FOR 2023.
WE WERE ASKED TO PARTICIPATE IN A NATIONWIDE STUDY AS ONE OF THE 50 DIAPER BANKS, AND THERE ARE OVER 200 DIAPER BANKS IN THE COUNTRY THAT CELEBRATE THIS WEEK AS DIAPER NEED AWARENESS WEEK.
WE USED TO SAY THAT 1 IN 3 FAMILIES NEEDED OUR HELP AND STRUGGLED WITH DIAPER NEED.
46% OF THOSE FAMILIES REPORT CUTTING BACK ON OTHER ESSENTIALS IN ORDER TO BUY DIAPERS, INCLUDING 35% REPORTING THAT THEY CUT BACK ON GROCERIES. FAMILIES WHO REPORT DIAPER NEED MISS ON AVERAGE, WE USED TO SAY FOUR DAYS A MONTH OF WORK BECAUSE THEY DIDN'T HAVE ENOUGH DIAPERS TO SEND THEIR CHILDREN TO DAYCARE.
87 AND THIS IS THE MOST STAGGERING STATISTIC THAT WE FOUND AND SO TROUBLING THAT 87% OF OUR FAMILIES ARE ACTUALLY EMPLOYED AND MOST OF THEM ARE WORKING TWO OR MORE JOBS.
[00:05:03]
IT IS THE FARTHEST FROM THE TRUTH.AND 27% OF THE 87% ARE MIDDLE INCOME FAMILIES NOW.
DIAPER COST HAS INCREASED 32% OVER THE LAST FOUR YEARS.
AND SO HAPPY BOTTOMS HAS INITIATED TWO VERY INNOVATIVE OPPORTUNITIES.
ONE, WE KNOW THE GAP IS WIDER AND DEEPER.
AND SO IN JANUARY OF 2024, WE WILL BE INCREASING THE NUMBER OF DIAPERS THAT WE PROVIDE TO FAMILY TO 75 DIAPERS VERSUS 50 DIAPERS A MONTH.
AND WE HOPE THAT THAT HELPS IN GETTING FAMILIES BACK TO WORK MORE DAYS, A MONTH.
ON TOP OF THAT, WE HAVE CREATED AN OUTREACH PROGRAM AND WE ARE DOING BUNDLES OF FIVE DIAPERS IN EVERY SIZE WITH A CARD ON IT FOR FAMILIES TO BE ABLE TO GO TO OUR 60 PARTNER AGENCIES THAT WE SERVE.
WE HAVE JUST RECENTLY ROLLED THIS OUT TO THE KANSAS CITY MISSOURI POLICE DEPARTMENT, LEAWOOD POLICE DEPARTMENT, INDEPENDENCE FIRE DEPARTMENT, CASA AND SEVERAL OTHER OUTREACH AREAS AND I AM HOPING THAT THE LENEXA POLICE DEPARTMENT AND FIRE DEPARTMENT WILL TAKE THESE.
AND ONE QUICK SHORT STORY IS INDEPENDENCE.
WE ROLLED THIS OUT TO INDEPENDENCE IN JULY.
THAT FRIDAY THAT WE HAD THE HORRIBLE STORM IN KANSAS CITY A TREE FELL ON A HOME IN INDEPENDENCE, CAUGHT THE HOUSE ON FIRE AS THE FIRE DEPARTMENT WAS FIGHTING THE FIRE.
THE ONLY THE FAMILY GOT OUT WITH BASICALLY THE CLOTHES ON THEIR BACKS AND THEY LOST EVERYTHING.
DURING THAT FIRE THE BABY NEEDED TO BE CHANGED.
FIRE DEPARTMENT GRABBED A PACK OF DIAPERS, CHANGED THE DIAPER, WHILE THE OTHER FIREMEN WERE FIGHTING THE FIRE AND THEN GAVE THE FAMILY ENOUGH DIAPERS TO GO INTO EMERGENCY SHELTER.
THANKS, SUSAN. I'M NOT SURE CHANGING DIAPERS IS A GOOD SALES JOB ON OUR OUR CHIEFS BACK THERE.
SURE. THANK YOU. THANK YOU, STEPHANIE.
WHEREAS COMMUNITY PLANNING PROVIDES AN OPPORTUNITY FOR ALL RESIDENTS TO MEANINGFULLY BE AND BE MEANINGFULLY INVOLVED IN MAKING CHOICES THAT DETERMINE THE FUTURE OF THEIR COMMUNITY. AND WHEREAS, THE MONTH OF OCTOBER IS DESIGNATED AS NATIONAL COMMUNITY PLANNING MONTH THROUGHOUT THE UNITED STATES OF AMERICA.
AND WHEREAS, THE CELEBRATION OF NATIONAL COMMUNITY PLANNING MONTH GIVES US THE OPPORTUNITY TO PUBLICLY RECOGNIZE THE PARTICIPATION AND DEDICATION OF PROFESSIONAL STAFF, THE MEMBERS OF THE PLANNING COMMISSION, THE CITIZENS WHO HAVE CONTRIBUTED THEIR TIME AND EXPERTISE TO THE IMPROVEMENT OF THE CITY OF LENEXA.
NOW, THEREFORE, I, MICHAEL BOEHM THE MAYOR OF THE CITY OF LENEXA, DO HEREBY PROCLAIM THE MONTH OF OCTOBER TO BE NATIONAL COMMUNITY PLANNING MONTH IN LENEXA AND STEPHANIE [APPLAUSE]. COOL.
SO OUR TEAM IS COMPRISED OF KIM PORTILLO, DAVE DALECKI AND LOGAN STRASBURGER IS OUR NEWEST PLANNER.
WE ALSO HAVE GLORIA LAMBERT AND JIM WALBERT AND OUR INTERN WILL SHARP.
AND THAT MAKES UP OUR PLANNING DIVISION.
THANK YOU, STEPHANIE. OUR NEXT ITEM IS THE CONSENT AGENDA ITEMS ONE THROUGH SEVEN.
[CONSENT AGENDA ]
ALL MATTERS LISTED WITHIN THE CONSENT AGENDA HAVE BEEN DISTRIBUTED TO EACH MEMBER OF THE GOVERNING BODY FOR REVIEW OR CONSIDERED TO BE ROUTINE AND WILL ACT ON BY ONE MOTION WITH NO SEPARATE DISCUSSION.MOTION BY JULIE, SECOND BY COURTNEY.
ANY OPPOSED? CONSENT AGENDA HAS BEEN APPROVED.
[8. Ordinance approving a three-year special use permit for a personal instruction, general use for A Greater You located at 9900 Pflumm Road, Suite 44 in the BP-2, Planned Manufacturing District ]
GENERAL USE FOR A GREATER YOU.[00:10:01]
LOCATED AT 9900 PFLUMM ROAD, SUITE 44, IN THE BP-2 PLAN MANUFACTURING ZONING DISTRICT.ALL RIGHT IN HONOR OF PLANNING MONTH COMING UP, YOU JUST GET TO HEAR FROM ME A LOT TONIGHT.
SO OUR FIRST ITEM ON THE REGULAR AGENDA TONIGHT IS A GREATER YOU.
AND AS MENTIONED, IT'S A SPECIAL USE PERMIT FOR A THREE YEAR TERM.
AND THE PROJECT LOCATION IS 9900 PFLUMM ROAD, SUITE 44.
ON THE SCREEN NOW, YOU CAN SEE THE LOCATION.
IT'S JUST WEST OF PFLUMM ROAD AND SOUTH OF 99TH STREET.
AND THE TENANT SPACE IS DENOTED WITH THE RED STAR ON THE MAP ON THE SCREEN.
THE TENANT SPACE IS APPROXIMATELY 7700FTĀ².
AND WE'LL SEE SOME PICTURES OF THE INSIDE AS WELL.
ZONING WISE, IT IS ZONED BP-2, AS YOU CAN SEE IN THE PURPLE, AS IS EVERYTHING SURROUNDING IT.
AND IT'S ALSO DENOTED AS BUSINESS PARK ON THE FUTURE LAND USE MAP.
THIS IS THE EXTERIOR OF THE BUILDING.
AND WE HAVE A FEW PHOTOS OF THE INTERIOR.
THIS PHOTO IS TAKEN FROM THE TOP OF A RAMP THAT IS USED TO HELP TRAINING THE CLIENTS THAT ARE DOING SOCCER TRAINING, AND IT HELPS THEM DECELERATE AS THEY'RE PRACTICING THEIR RUNNING SKILLS.
SO I'M ACTUALLY PRETTY HIGH UP IN THERE.
HERE'S ANOTHER VIEW FROM THE OPPOSITE CORNER.
AND THIS IS A LARGER OPEN FIELD FOR DIFFERENT TYPES OF PRACTICING AND TECHNIQUE TRAINING.
AND I WILL NOTE THAT THIS PARTICULAR APPLICANT DID OCCUPY A DIFFERENT SPACE IN THE SAME BUSINESS PARK PREVIOUSLY IN A SMALLER SPACE THAT DID NOT REQUIRE A SPECIAL USE PERMIT. THEY HAD NO COMPLAINTS AT THAT LOCATION.
AND BECAUSE OF THAT AND VERY SIMILAR USE MOVING FORWARD TO JUST A LITTLE BIT LARGER LOCATION.
I DO ALSO WANT TO NOTE THAT IT HAS SOME PARTNERING BUSINESSES CALLED RUNNING MATE CASEY AND SOCCER TRAINER, AND THEY WILL BE PARTNERING AS A GROUP OF THREE DIFFERENT ENTITIES, SHARING THE SPACE ALL FOR THE SAME PURPOSE, BASICALLY OF ATHLETIC AND SOCCER TRAINING TYPE USES.
THAT CONCLUDES MY PRESENTATION.
JASON, ARE YOU HERE THIS EVENING? YOU'RE WELCOME TO COME UP AND MAKE REMARKS OR STAND FOR QUESTIONING, WHICHEVER YOU PREFER.
BUSINESS PARK IS JUST A GREATER YOU FOR THE LAST TWO YEARS.
I'VE OPERATED SOLELY FOR EIGHT YEARS IN AND AROUND THE AREA.
HE WOULD JUST WORK OUT ON THE FIELDS 365, 120 DEGREE HEAT, RAIN, SNOW, COLD.
AND SO AS WE SHARED MORE ATHLETES, WE STARTED TO ENTER IN CONVERSATION OF HOW DO WE JUST BRING THE BUSINESSES UNDER ONE ROOF SO THAT ATHLETES, PARENTS COULD COME IN, SEE US FOR AN HOUR FOR THE PERFORMANCE SIDE, STAY FOR AN HOUR, DO THEIR TECHNICAL, AND NOW THEY'RE NOT DRIVING TO MULTIPLE PLACES ON MULTIPLE NIGHTS THROUGHOUT THE WEEK. SO SAVING THEM TIME, SAVING THEM ENERGY AND THEN RUNNING MATE IS A FRIEND OF MINE WHO'S A RUNNING SPECIFIC CHIROPRACTOR AND PHYSICAL THERAPIST.
HE JUST TREATS ABOUT FIVE PATIENTS A WEEK.
THANKS, JASON. QUESTIONS OR COMMENTS? DAN, JUST A QUICK COMMENT.
THANKS FOR YOUR BUSINESS. IT SOUNDS LIKE IT'S VERY SUCCESSFUL AND DEFINITELY FILLS A NEED.
THANK YOU. ANYONE ELSE? PUBLIC HEARING WAS THE PLANNING COMMISSION.
NO ONE SMOKED. THAT'S ALWAYS A GOOD SIGN.
SO CONGRATULATIONS ON THE EXPANSION.
THANK YOU. ENTERTAIN A MOTION TO APPROVE THE ORDINANCE APPROVING THE THREE YEAR SPECIAL USE PERMIT.
MOTION BY MELANIE. SECOND BY JOE.
ALL IN FAVOR? AYE. ANY OPPOSED? MOTION CARRIES. THANKS FOR COMING OUT TONIGHT.
THANK YOU. ITEM NUMBER NINE IS AN ORDINANCE APPROVING A
[9. Ordinance approving a five-year special use permit for a medical clinic use for NeuroEdge Chiropractic, LLC located at 13100 W. 95th Street, Suite 3A, in the NP-O, Planned Neighborhood Office District ]
[00:15:10]
FIVE YEAR SPECIAL USE PERMIT FOR A MEDICAL CLINIC USE NEUROEDGE CHIROPRACTIC LLC, LOCATED AT 13100 WEST 95TH STREET, SUITE THREE A IN THE NPO PLANNED NEIGHBORHOOD OFFICE DISTRICT.STEPHANIE THANK YOU, MAYOR AND COUNCIL.
AND THE LOCATION IS AT 13100 95TH STREET, WHICH IS ROUGHLY 95TH AND NOLAN ROAD, AS YOU CAN SEE ON THE MAP HERE, THAT IS THE PROPERTY LOCATION HIGHLIGHTED.
IT IS THE NORTHWEST CORNER OF 95TH AND NOLAN ROAD JUST TO THE WEST OF I-35.
THE SITE IS ZONED, NPO IS MENTIONED, WHICH IS AN OFFICE TYPE DISTRICT AND THE FUTURE LAND USE MAP DESIGNATES THIS FOR OFFICE AND EMPLOYMENT CENTER SO IT'S COMPATIBLE WITH THE COMPREHENSIVE PLAN IN ITS CURRENT STATE.
AND YOU'LL SEE A COUPLE OF DIFFERENT STREET VIEWS ON THE SCREEN NOW.
AS I MENTIONED WITH OUR LAST CASE, WE REVIEW 13 DIFFERENT CRITERIA FOR SPECIAL USE PERMITS.
UPON INSPECTION OF THIS PARTICULAR SITE, WE DID NOTICE SOME PROPERTY MAINTENANCE CONCERNS.
AND YOU CAN SEE HERE THAT THE TRASH BIN IS MISSING SOME SCREENING.
THERE ARE SOME ISSUES WITH JUST MAINTENANCE OF LANDSCAPING AND VEGETATION.
THE PARKING LOT WAS MENTIONED AS A CONCERN AND HAD A LOT OF JUST POTHOLES AND STRIPING DEFICIENCIES THAT NEEDED TO BE CORRECTED AND THE PROPERTY OWNERS ACTUALLY ALREADY REMEDIED THAT CONCERN.
AND THEN IF ANY DEAD TREES ARE REMOVED, THEY WILL NEED TO BE REPLACED PER CODE AS WELL.
HOWEVER, IF FOR SOME REASON AFTER 90 DAYS THAT IS NOT COMPLETED, WE WOULD SEEK PROPERTY MAINTENANCE COMPLETION THROUGH OUR NOTICE OF VIOLATION AND CODE ENFORCEMENT TYPE PROCESS BEFORE REVOKING THE SPECIAL USE PERMIT.
AND THAT CONCLUDES MY PRESENTATION.
DR. MALLOY, ARE YOU HERE THIS EVENING? ANY QUESTIONS? COMMENTS? I CAN'T REALLY THINK OF ANY COMMENTS.
I'VE BEEN A ASSOCIATE FOR ABOUT EIGHT YEARS NOW, SO I'M EXCITED TO KIND OF GET OUT ON MY OWN AND HELP THE COMMUNITY OF LENEXA BECAUSE I GREW UP HERE AND WANT TO GET BACK. SO GREAT.
YEAH. YOU GUYS HAVE ANY QUESTIONS? I HAVE A QUESTION FOR STAFF.
WE HAVE PROPERTY OWNERS AND CODE ISSUES.
IF WE IF THOSE ARE NOT COMPLETED IN THE 90 DAYS IS REQUIRED, IS IT ONE SPECIAL USE PERMIT THAT GETS REVOKED OR IS IT EVERYBODY USING THE BUILDING? DR. MALLOY, CARRY THE BURDEN OF THAT ON HIS PRACTICE OR IS IT A ALL OF OVER? I THINK I THINK I CAN ANSWER THAT.
THE CODE GIVES US SOME OPTIONS TO PURSUE COMPLIANCE.
AS FAR AS THE TREE TRIMMING AND THE THE BRUSH, I'VE BEEN WORKING WITH THE PROPERTY MANAGER GAVE HER SOME IDEAS ABOUT TREE TRIMMING SERVICES, WHICH, COINCIDENTALLY ENOUGH, WITH THE STORM A COUPLE OF WEEKS AGO, IT'S BEEN A BEAST TRYING TO GET A TREE TRIMMING SPECIALIST BOOKED.
[00:20:03]
SO WE ACTUALLY DO CURRENTLY HAVE ONE BOOKED FOR THE 22ND COMING UP.I BELIEVE THE DENTIST NEXT DOOR IS WORKING IN CONJUNCTION WITH PAM, THE BUILDING MANAGER, TO RESOLVE THAT THAT ISSUE THROUGH A MUTUAL CONTACT WITH THE DENTIST CHURCH, IF I UNDERSTAND THAT CORRECTLY.
BUT YEAH, WE'RE WORKING HARD TO GET THOSE ISSUES RESOLVED.
ANYONE ELSE QUESTIONS? NEED A MOTION TO APPROVE THE ORDINANCE APPROVING THE FIVE YEAR SPECIAL USE PERMIT FOR NEUROEDGE.
SECOND, I DIDN'T FINISH, SO I DON'T KNOW WHO SAID THAT.
SECOND BY JULIE. ALL IN FAVOR? AYE. ANY OPPOSED MOTION CARRIES.
[10. Ordinance approving a five-year special use permit for a medical clinic use for Headache Relief Center located at 8807 Long Street in the NP-O, Planned Neighborhood Office District ]
OFFICE DISTRICT.STEPHANIE. STEPHANIE KESSLER AGAIN AND WE HAVE ANOTHER SPECIAL USE PERMIT REQUEST FOR A CHIROPRACTOR, THIS TIME AT A DIFFERENT LOCATION AT 8807 LONG STREET. AND THIS ONE IS KNOWN AS HEADACHE RELIEF CENTER.
ON THE SCREEN HERE, YOU CAN SEE THE LOCATION OF THE SITE.
IT IS AT ABOUT 88TH AND LONG, IF YOU'RE FAMILIAR.
THIS IS JUST TO THE WEST OF THE POST OFFICE THAT'S ON MONROVIA STREET AND SOUTH OF 87TH STREET.
THIS IS ALSO A MULTI-TENANT BUILDING.
AND THIS PARTICULAR TENANT IS ON THE NORTH SIDE OF THE BUILDING.
THE SITE IS ZONED NPO AN OFFICE TYPE ZONING DISTRICT.
AND YOU CAN SEE AROUND IT THERE'S A MIXTURE OF CP-2 IN THE RED TO THE NORTH, EAST AND SOUTH AND THEN TO THE WEST, BP-2 IN THE PURPLE AND ON THE FUTURE LAND USE MAP YOU SEE ON THE RIGHT SIDE OF THE SCREEN, THE SITE IS BUSINESS PARK DESIGNATION, AND AROUND IT IN THE RED YOU HAVE COMMUNITY COMMERCIAL CENTER AND PUBLIC AND OPEN SPACE WHERE THE POST OFFICE IS LOCATED IN THE GREEN.
HERE ARE SOME STREET VIEWS OF THE BUILDING.
AGAIN, IT'S ON THE NORTH SIDE OF THE BUILDING AND IT'S ONE OF MANY TENANTS IN THE BUILDING AND THEY ARE SEEKING THAT SPECIAL USE PERMIT FOR FIVE YEARS FOR THE MEDICAL CLINIC TYPE USE IN ORDER TO HAVE A CHIROPRACTIC OFFICE AT THIS LOCATION.
I'M HAPPY TO ADDRESS ANY OF THOSE OR ANSWER ANY QUESTIONS YOU MAY HAVE.
THAT CONCLUDES MY PRESENTATION.
THANK YOU. THANK YOU, STEPHANIE.
SCOTT, ARE YOU HERE THIS EVENING? I'M HERE. THANK YOU. REMARKS.
WELL, FIRST OF ALL, GOOD EVENING.
I'M CURRENTLY IN MY 31ST YEAR IN PRIVATE PRACTICE.
MY PRACTICE IS EXCLUSIVELY HEADACHE AND MIGRAINE RELATED.
WE DO NOT ACCEPT ANY OTHER CASES.
WE ALSO HAVE A NETWORK OF NEUROLOGISTS, PAIN SPECIALISTS.
SO OUR PHILOSOPHY IS FIND THE CAUSE OF THE PROBLEM FIRST AND RATHER THAN GETTING THE TYPE OF TREATMENT THAT THAT PARTICULAR DOCTOR HAPPENS TO PROVIDE, LET'S MAKE SURE THEY GET WHAT THEY REALLY NEED TO FIX THE PROBLEM ONCE AND FOR ALL.
WE WERE THERE ABOUT EIGHT YEARS.
AND BECAUSE OUR PATIENT BASE COMES FROM THE ENTIRE KANSAS CITY AREA, IT'S BEEN A BLESSING FOR MY BUSINESS, BEING SO CONVENIENT FOR SO MANY PEOPLE TO BE ABLE TO JUMP OFF OF THE HIGHWAY AND IN LESS THAN TWO MINUTES PULL IN FRONT OF THE DOOR AND BE ABLE TO COME IN.
QUESTIONS ON THIS ONE? DO YOU WANT ME TO READ IT OR DOES SOMEONE WANT TO READ IT MAKE A MOTION? I'LL PULL OUT MY NUN'S RULER HERE IN A MINUTE.
SECOND BY DAN. ALL IN FAVOR? AYE. OPPOSED.
APPROVED. THANK YOU. THANK YOU, MAYOR.
THANK YOU FOR STAYING IN LENEXA AND YOUR INVESTMENT.
[11. Consideration of a preliminary plan/plat for a single-family residential subdivision known as Falcon Farm, located near the northeast corner of 101st Street & Lone Elm Road within the R-1, Single-Family Residential District ]
101ST STREET AND LONE ELM WITHIN THE R-1 SINGLE FAMILY RESIDENTIAL DISTRICT, STEPHANIE.[00:25:02]
STEPHANIE KESSLER HERE AGAIN TO PRESENT THE PRELIMINARY PLAT REQUEST FOR FALCON FARM.THIS PROJECT WAS PREVIOUSLY KNOWN AND SIGNED AS RAMAN 101ST STREET SINGLE FAMILY.
SO JUST SO YOU'RE AWARE, AKA RAMAN 101ST SINGLE FAMILY, SAME PROJECT.
AND THIS IS NEAR THE NORTHEAST CORNER OF 101ST AND LONE ELM.
THIS IS THE PRELIMINARY PLAT AND THIS IS FOR 66 SINGLE FAMILY LOTS EIGHT TRACKS AND IT'S A TOTAL OF 30 ACRES FOR THIS PARTICULAR DEVELOPMENT. THE DENSITY IS 2.2 DWELLING UNITS PER ACRE.
THERE WAS A PREVIOUS PLAT FOR THIS PARTICULAR PROPERTY.
AND BASICALLY THESE LOTS THAT YOU SEE ON THE SCREEN HERE ALONG 99TH TERRACE AND WHAT TURNS INTO MARION STREET HERE WILL LINE THAT STREET AND FACE TOWARD LONE ELM AND 101ST STREET AND THE SIKH TEMPLE.
ALSO NOTABLE IS AN EASEMENT FOR POWER LINES GOING THROUGH DIAGONALLY.
THAT'S WHAT ALL THOSE DIAGONAL LINES ARE IN THAT PARTICULAR AREA.
ALL THE DIFFERENT SUBDIVISIONS IN THE VICINITY ARE COLORED, A DIFFERENT COLOR.
AND YOU CAN SEE THERE ARE DIFFERENT NAMES OF THE SUBDIVISION AND THEIR HOUSING CLASSIFICATION.
A ONE AND A HALF STORY WOULD HAVE 1650FTĀ² MINIMUM FOR THE GROUND FLOOR.
AND IF THERE IS A TWO STORY, IT WOULD BE 1250FTĀ² ON THE FIRST FLOOR.
YOU'LL SEE HERE THAT THERE ARE SOME PLANTINGS PROPOSED.
THERE IS A PUBLIC TRAIL PLANNED.
THIS IS AN EXCERPT FROM OUR TRAIL PLAN.
YOU CAN SEE RIGHT THROUGH THE PARTICULAR PLAT BOUNDARY WHICH IS OUTLINED HERE IN BLACK.
THAT SHAPE THERE THROUGH THAT POWER LINE EASEMENT, THERE IS A PLANNED TRAIL.
AND HERE YOU CAN SEE THAT ALIGNMENT ON THE SITE PLAN OR THE PLAT HERE.
I DO WANT TO NOTE, SPEAKING OF SITE PLAN AND PLAT, THIS IS FOR A PRELIMINARY PLAT/PLAN.
THEY ARE SERVING IN TANDEM WITH EACH OTHER FOR THIS PARTICULAR PROJECT.
SO YOU WOULD JUST SEE A FINAL PLAT COME BACK THROUGH.
AND THEN AS I MENTIONED WITH THE LANDSCAPING TRACT D IS ONE OF THE LANDSCAPE BUFFERS ALONG LONE ELM AND THAT WOULD NEED TO BE INCREASED TO THE MINIMUM OF 15FT. SO THESE ARE JUST SOME COMMENTS THAT WE WANTED TO MAKE SURE THE APPLICANT SAW AND THE PLANNING COMMISSION SAW TO BE SURE THAT THEY GOT ADDRESSED BETWEEN PRELIMINARY AND FINAL STAGE.
[00:30:05]
THE NORTHEAST CORNER OF 101ST AND LONE ELM FOR A SINGLE FAMILY DEVELOPMENT WITH THE CONDITION THAT THE PLAT BE REVISED TO ADDRESS THOSE COMMENTS THAT YOU SAW ON THE PREVIOUS SLIDE. AND THAT CONCLUDES MY PRESENTATION FOR THIS ITEM.THANK YOU. IS MR. FINN HERE? AND IF YOU'RE AT LIBERTY TO DISCLOSE WHO THE DEVELOPER IS.
VERMONT PROPERTY IS THE DEVELOPER.
GOOD EVENING, MR. MAYOR. COUNCIL MEMBERS.
MY NAME IS MASON OLSON. I'M A CIVIL ENGINEER WITH OLSON HERE TO REPRESENT THE DEVELOPER TONIGHT.
THERE ARE DIFFERENT SPELLINGS ON THAT OLSON I'M ONE.
THANK YOU GUYS FOR HEARING OUR CASE TONIGHT.
STEPHANIE DID A GREAT JOB DESCRIBING THE PROJECT, SO I WILL NOT ADD TOO MUCH MORE TO THAT.
COUNCIL? JOE. YEAH, A QUESTION AND COMMENT.
SO QUESTION FIRST, HOW IS WATER HANDLED OR RETAINED? IS THERE A REGIONAL FACILITY? YEAH, THERE IS AN EXISTING DETENTION POND THAT WAS ALREADY CONSTRUCTED AS PART OF THE PRIOR STONE VIEW DEVELOPMENT.
WE ARE UTILIZING A PORTION OF THAT POND AND PART OF OUR DEVELOPMENT.
MY COMMENT IS I'M SUPER EXCITED TO SEE MORE SINGLE FAMILY DEVELOPMENT.
THIS IS, I WOULD ASSUME, WITH THE POWER LINES GOING THROUGH A DIFFICULT PIECE TO DEVELOP.
SO VERY HAPPY TO SEE THIS AND EXCITED TO SEE IT COME FORWARD.
SO 1,600 FOOT IS WHAT I SEE IN OUR PACKET AND SO FORTH.
WHAT'S THE TOTAL SQUARE FOOTAGE OF THE HOUSE? BECAUSE THE 1,600 JUST MY IMPRESSION WAS IT'S A FAIRLY SMALL HOUSE FOR A FAIRLY DECENT FOOTPRINT IN THE LOT.
SO THE GRADING LAYS OUT TO THERE COULD BE SOME SPLIT AND FULL BASEMENT HOMES MIXED IN WITH THERE.
IT JUST KIND OF COMES WITH THE DEVELOPER'S CHOICE OF WHAT THE FINAL PRODUCT WILL END UP BEING.
OKAY. AND WHAT'S YOUR PRICE POINT? I BELIEVE THE RANGE WAS IN THE $700,000 PLUS RANGE.
PLEASE REFRESH IF THERE'S ANY REQUIREMENT FOR LANDSCAPING OR FENCES ALONG AN EASEMENT.
SO THERE'S NO LANDSCAPING EASEMENT BETWEEN WHERE THAT TRAIL WOULD BE AND THE BACK OF THE PROPERTIES, SO IT WOULD JUST PUT THEM RIGHT ON THE PROPERTY LINE. THERE'S NOTHING.
OKAY. AND THERE'S ALSO RESTRICTIONS THAT EVERGY HAS WITH WHAT CAN GO IN THAT EASEMENT.
SO THEY'RE OFTEN VERY PICKY WITH THE LEVEL OF LANDSCAPING THAT THEY WOULD ALLOW.
AND I'VE HEARD EVEN SHRUBS ARE KIND OF BEING SO YEAH. COURTNEY, IT WAS JUST A COMMENT FOR STAFF.
I REALLY APPRECIATED THE CLASSIFICATION TABLE WITH THE A, B, C, D.
WE HAVEN'T SEEN THAT BEFORE OR AT LEAST I HAVEN'T IN MY TERM.
AND SO I THAT WAS NEW INFO TO BE ADDED INTO THIS AND I APPRECIATED THAT.
YES, STEPHANIE, THANK YOU FOR THAT CHART.
THE PLANNING COMMISSION ASKED ABOUT THE SIZES AND I DIDN'T UNDERSTAND THE ANSWER, BUT THAT CHART REALLY, REALLY SHOWS IT. SO THANK YOU.
ARE WE TO UNDERSTAND THAT THERE'S THREE STORMWATER AREAS THE LOOKS LIKE ONE IS SAYS EXISTING.
IT LOOKS LIKE TIM MIGHT HAVE A QUICK ANSWER FOR YOU.
THERE'LL BE SOME WORK DONE TO IT.
[00:35:01]
THIS IS THE EXISTING BASIN RIGHT NOW AND THERE IS FLOW THAT COMES THROUGH HERE AND THEN IT COMES BACK DOWN THROUGH HERE THAT WILL BE REVISED AND IMPROVED.THERE'S A BASIN UP HERE AND THEN THERE'S A THIRD BASIN THAT WILL BE BUILT UP IN THIS CORNER.
SO THERE WILL BE THREE BASINS.
YOU KNOW, SO IT IT SERVES HIGHLAND CREST AND ALSO LAND TO THE SOUTH.
I BELIEVE IT SERVES PART OF STONE VIEW TO THE SOUTH, CORRECT? YEAH. NOW, IS IT GOING TO BE THAT HOAS RESPONSIBILITY TO MAINTAIN THAT? YES. PLANNING COMMISSION ASKED QUESTIONS ABOUT THE OTHER TWO AND I THINK IT THAT THIRD ONE SNUCK UP ON ME.
IT'S AN EXISTING BASIN THAT'S OUT THERE NOW AND I BELIEVE THAT PROPERTY OWNER IS MAINTAINING IT.
THERE'S NOT A LOT OF MAINTENANCE TO IT.
WHAT IS THE EXPECTATION? BECAUSE I KNOW WE'VE HAD ISSUES WITH SOME STORMWATER OUT WEST OF SAINT JAMES AND ALSO WEST OF LONE ELM. WHAT'S THE EXPECTATION? I BELIEVE THIS IS JUST A DETENTION BASIN, CORRECT? YEAH, IT'S JUST A DETENTION BASIN, SO THERE'S NO REQUIREMENT IT CAN BE LEFT NATIVE.
BUT THE BASIN ITSELF CAN BE JUST A NATIVE BASIN.
YEAH. THAT THOSE TWO BACK RIGHT UP TO HOUSES, CORRECT? YEAH. SO THERE THERE NEEDS TO BE AN EXPECTATION SET ON LIKE YOU SAY, I WOULD THINK MOWING PUT A, PUT AN EDGE ON IT AND WHATEVER'S BEHIND THE EDGE.
WE'LL LOOK AT THAT CLOSER WOULD YOU PLEASE.
YEAH. THE THE JOGGING TRAIL EASEMENT, YOU KNOW IT GOES IT GOES ALL THE WAY TO LIVE CHURCH ALSO, AND ALSO UP TO BUFFALO MEADOWS.
CORRECT. WHEN WE WHEN WE GET AROUND TO BUILDING THAT TRAIL.
CITY MAINTAIN IT? YES. AND IT WOULD BE A CITY TRAIL THAT WE CONSTRUCT.
AND I ASSUME WE WOULD MAINTAIN IT.
YES. YES. IT WOULD BE A TRAIL WE WOULD BUILD.
AND AS THOSE PLATS HAVE COME THROUGH, THE ONE TO THE SOUTH FOR THE CHURCH AND THEN THE SUBDIVISIONS TO THE NORTH, WE HAVE GOT GOTTEN ADDITIONAL EASEMENTS FOR TRAILS ON ALL OF THOSE.
YEAH. WHAT WHAT? BECAUSE IT TALKS ABOUT THE SUBDIVISION SUBDIVISION MAINTAINING AND THAT TO ME IMPLIES MOWING AND KEEPING IT NOT TOO OVERGROWN ON THE TRAIL.
BUT IS IT OUR EXPECTATION THAT AFTER WE BUILD IT, WE'LL MOW AND MAINTAIN? I'M GOING TO DEFER TO LOGAN TYPICALLY WE'LL MOW A STRIP.
YEAH. BECAUSE THIS IS QUITE A SWATH THROUGH HERE.
I THINK THIS IS PART OF THE REASON IT'S SAT VACANT SO LONG.
YES. HARD TO LIKE JOE SAID, HARD TO DEVELOP.
WE WOULD MOW MOW STRIP ON EACH SIDE OF THE TRAIL, MAINTAIN A BUFFER.
AND WHAT ABOUT IT'S 20FT? SO YOU GOT TEN FEET AND THREE ON EACH SIDE AND YEAH, 20FT TOTAL, ABOUT A TEN FOOT WIDE TRAIL IS TYPICALLY WHAT OUR STANDARD IS NOW GOING FORWARD.
SO WE MIGHT AS WELL DO THE WHOLE THING.
YEAH, MIGHT AS WELL MIGHT AS WELL.
YEAH. SO BECAUSE PEOPLE ARE GOING TO THINK IT'S OURS, SO WE MIGHT AS WELL DO IT TO OUR STANDARDS.
AND I THINK A LOT OF THAT WILL BE DEPENDING ON HOW WE LAY THAT TRAIL OUT IN THAT EASEMENT TOO.
I DON'T THINK WE'LL HAVE A STRAIGHT SHOT.
I DON'T RECALL SEEING THAT ON THE CIP YET.
GOT IT. THANKS. CIRCLE BACK TO DAN.
I'M SORRY. YES, YOU ARE CORRECT.
USUALLY I THINK WE WOULD BE SHOWING THAT AT FINAL PLAN STAGE.
BUT IF YOU'D LIKE, I'M SURE MASON COULD TALK ABOUT INTENDED ARCHITECTURE OR STORIES OR ANY SORT OF DESIGN AT THIS POINT. AT THE MOMENT, I DON'T HAVE ANYTHING CONCRETE FOR THE FINAL LOOK AND STYLE.
THAT HAS JUST NOT BEEN QUITE FINALIZED YET.
OKAY. THANK YOU. CONFIRM ONE THING FOR ME.
[00:40:05]
I'M SURE IT'S JUST THE WAY THE MAPS ARE INLAID, BUT 99TH STREET TO THE RIGHT DOES CONNECT TO WHATEVER I CAN'T SEE 99TH STREET ON THE LEFT.THAT'S CORRECT. AND JUST TO POINT THIS OUT, TOO, THIS IS NOT SINGLE FAMILY LOTS RIGHT HERE.
THIS IS A TRACT WITH A BASIN IN IT.
IT'S GOING TO BE TO THIS BASIN HERE.
THANK YOU. ANYONE ELSE? THEN I NEED A MOTION TO APPROVE THE PRELIMINARY PLAN/PLAT FOR THE SINGLE FAMILY RESIDENTIAL SUBDIVISION KNOWN AS FALCON FARM.
ALL IN FAVOR? AYE. ANY OPPOSED? THE PLAN IS APPROVED. THANK YOU.
[12. Consideration of a preliminary plan/plat for a multi-family residential development known as Canyon Creek Apartment Homes, located near the northeast corner of K-10 Highway & Canyon Creek Boulevard within the RP-4, Residential Planned (High-Density) District and the RP-2, Residential Planned (Intermediate-Density) District ]
ITEM NUMBER 12 IS CONSIDERATION OF A PRELIMINARY PLAN/PLAT FOR A MULTI FAMILY RESIDENTIAL DEVELOPMENT KNOWN AS CANYON CREEK.APARTMENT HOMES LOCATED NEAR THE NORTHEAST CORNER OF K-10 HIGHWAY AND CANYON CREEK BOULEVARD WITHIN THE RP-4 PLANNED RESIDENTIAL HIGH DENSITY RP-4 RESIDENTIAL PLANNED HIGH DENSITY DISTRICT AND THE RP-2 RESIDENTIAL PLAN TO MEET INTERMEDIATE DISTRICT.
AND THIS IS CANYON CREEK APARTMENT HOMES.
SO YOU MIGHT SEE THAT TERM WRITTEN IN THE STAFF REPORT A COUPLE OF TIMES AND DISCUSS THIS EVENING.
NOW ON THE MAP YOU WILL SEE THE SUBJECT SITE OUTLINED IN RED.
IT'S KIND OF A STRANGE SHAPE IN THE MIDDLE OF UNDEVELOPED LAND, BUT THIS PROJECT WILL ENTAIL A COMPLEMENTARY INSTALLATION OF 100TH STREET FOR THIS PROJECT'S ACCESS.
YOU MAY RECALL THAT THIS PARTICULAR SITE, TRACT FOUR, WENT TO THE PLANNING COMMISSION, TO THE CITY COUNCIL AROUND CHRISTMAS TIME LAST YEAR AND WAS ACTUALLY REMANDED BACK TO THE PLANNING COMMISSION TO TALK ABOUT RP-4 AND RP-5, BECAUSE ORIGINALLY THEY PROPOSED RP-5 IN THIS PARTICULAR AREA, WENT BACK THROUGH FOR ANOTHER LOOK AND THEY CHANGED THEIR PROPOSAL TO GO TO RP-4 ZONING WITH SOME HEIGHT DEVIATIONS FOR BUILDINGS.
SO I KNOW THAT WAS MANY MONTHS AGO AND WE'VE HAD A LOT OF PROJECTS IN BETWEEN.
AND THE RP-2 PORTION WAS ORIGINALLY PLANNED FOR SOME TOWNHOMES OR DUPLEX STYLE DEVELOPMENT, BUT THEY WANTED TO INCLUDE THAT PORTION OF THIS WITH THEIR MULTIFAMILY PROJECT FOR THE PURPOSES OF A DOG PARK AMENITY FOR THE RESIDENTS.
SO IT WILL NOT HAVE ACTUAL CONSTRUCTION OF BUILDINGS.
THAT'S ABOUT AN ACRE IN SIZE IN THAT YELLOW AREA.
ALSO OF NOTE IS IN GREEN HERE.
THERE IS SOME RP-4 ZONING REMAINING, ABOUT EIGHT ACRES OF IT JUST TO THE WEST.
AGAIN, THE PROJECT SITE IS THE RED AREA, PLUS THE YELLOW AREA, NOT THE GREEN AREA.
NOW ON THIS SLIDE, YOU CAN SEE THE ZONING MAP AND FUTURE LAND USE MAP.
AS WE'VE TALKED ABOUT ALREADY, IT'S ZONED RP-4 IN THE BROWN FOR THE MAJORITY OF THE PARCEL AND THEN A LITTLE BIT OF ZONED RP-2 IN THE YELLOW WHERE THAT DOG PARK WILL BE LOCATED. AND AROUND IT YOU CAN SEE SOME MORE RP-2 THAT OTHER SECTION OF RP-4 AND SOME BP-2 ABUTTING IT TO THE EAST.
THE FUTURE LAND USE MAP DESIGNATES THE SITE FOR OFFICE RESEARCH AND DEVELOPMENT.
[00:45:04]
AND GIVEN THE PREVIOUS APPROVAL THIS YEAR FOR THAT CONCEPT PLAN AND REZONING FOR CEDAR CANYON WEST AND ALL THE SEVEN TRACKS, WE WILL LIKELY BE UPDATING THE CLASSIFICATION ON THE FUTURE LAND USE MAP TO MATCH WHAT WAS ALREADY APPROVED FOR ZONING AND CONCEPT PLAN.SO IT IS, AS OF RIGHT NOW, NOT COMPATIBLE WITH THE FUTURE LAND USE MAP YOU SEE ON THE SCREEN.
AND I'VE GOT SOME QUICK FACTS FOR YOU ON THE SCREEN HERE.
THERE'S A TOTAL OF JUST OVER 200 DWELLING UNITS, 212 TO BE EXACT, FIVE BUILDINGS AND A TOTAL OF JUST OVER 200,000FTĀ² OF BUILDING AREA.
AND THE BUILDINGS ARE 3 TO 4 STORY'S TALL.
AND WE'LL TALK ABOUT THAT A LITTLE MORE IN DEPTH WHEN WE TALK ABOUT DEVIATIONS.
WE'VE GOT SOME MORE GRAPHICS ON THE CONNECTIONS HERE IN JUST A COUPLE OF SLIDES.
AND DENSITY WISE, THE RP-4 ZONING DISTRICT ALLOWS A MAXIMUM OF 16 DWELLING UNITS PER ACRE.
THE CONCEPT PLAN SHOWED 13.07 DWELLING UNITS PER ACRE.
DOES THAT INCLUDE THE DOG PARK LAND AREA IN THE CALCULATION? YES. OKAY.
AS MENTIONED, THERE'S A LOT OF CONNECTIVITY GOING HERE IN YELLOW.
YOU CAN SEE THE FUTURE 100TH STREET AND 99TH PLACE.
THERE IS A TRAIL JUST TO THE EAST OF THE PROPERTY IN BLUE, AND THAT WILL GO ALONG THAT STREAM CORRIDOR AREA AND CONNECT, HOPEFULLY THROUGH A WHOLE NEW TRAIL SYSTEM ON THE WEST SIDE OF CLARE ROAD AS IT GOES THROUGH SORT OF THIS WESTERN PORTION OF LENEXA BETWEEN CLARE ROAD AND CEDAR CANYON OR SORRY, CANYON CREEK BOULEVARD.
AGAIN, THAT WEST PROPERTY IS ZONED RP-4 AS WELL, AND WE WANTED TO BUILD IN SOME CONNECTIVITY SO THAT WE'RE PLANNING ACCORDINGLY FOR THOSE TWO SITES TO MESH WELL TOGETHER IN THE FUTURE.
SO YOU CAN SEE ON THE SCREEN THERE'S ONE CONNECTION POINT HERE AND ONE TOWARD THE SOUTH.
THIS IS THE PRELIMINARY PLAT COLORIZED FOR YOUR VIEWING ABILITY AND YOU CAN SEE LOT ONE, WHICH IS WHERE THAT MULTIFAMILY DEVELOPMENT WILL RESIDE IS IN RED HERE. THERE IS STREAM BUFFER ALONG THE EAST OF THE PROPERTY WHICH WILL BE PRESERVED AND INCLUDE THAT TRAIL CONNECTION WE SAW IN THE PREVIOUS SLIDE.
THERE'S ALSO SOME RIGHT OF WAY FOR THE NEW 100TH STREET AND 99TH PLACE AND SOME TRACKS THAT YOU SEE IN YELLOW TRACT B AT THAT DOG PARK AMENITY AREA.
ARCHITECTURALLY, THERE ARE SOME QUALITY BUILDING MATERIALS PROPOSED.
AS YOU CAN SEE, VARIOUS TYPES OF SIDING AND STONE WILL BE A PART OF THIS PARTICULAR DEVELOPMENT.
AND TYPICAL IMAGES OF RAILINGS AND WINDOWS AND BUILDING ACCENTS AND INSPIRATION ARE HERE ON THE SCREEN AS WELL. THIS IS JUST PRELIMINARY STAGE, SO THESE WILL BE FINE TUNED BEFORE THE FINAL PLAN IS APPROVED.
AND YOU WILL NOTE ON SOME OF THESE HERE YOU SEE A FOURTH STORY AND SOME YOU SEE THREE.
WE'VE GOT A COUPLE BETTER SLIDES TO SHOW THIS DEVIATION, BUT I'LL START TALKING ABOUT BUILDING HEIGHT NOW BECAUSE OF THE UNIQUE TOPOGRAPHY OF THE SITE AND THE WAY THAT THE SITE JUST SORT OF FALLS DOWN TOWARD THAT STREAM BUFFER AREA.
SO WE'VE GOT SOME MORE IMAGES ON THAT.
BUT YOU CAN SEE HERE WITH THE ARCHITECTURE WHAT THAT FOURTH STORY LOOKS LIKE IN SOME CASES.
[00:50:02]
AND THEN AS THE GRADE CHANGES AND THAT RETAINING WALL DROPS, IT GETS TO THAT FOURTH STORY DOWN HERE.SWITCHING GEARS FOR JUST A MINUTE HERE FROM BUILDING HEIGHT IS THE LANDSCAPE PLAN.
THIS IS A GREAT GRAPHIC TO GIVE YOU AN IDEA OF HOW GREEN THE SITE IS.
AND THERE'S GOING TO BE A GOOD BIT OF PRESERVATION ALONG K-10 AS WELL.
IF YOU HAVEN'T DRIVEN BY THE SITE OUT HERE, I ENCOURAGE YOU TO DO SO.
IT IS VERY DENSE WITH A LOT OF DIFFERENT NATIVE SPECIES.
SOME OF IT'S PROBABLY SCRUB TREES AND WILL NEED TO BE REMOVED.
SOME OF IT WILL BE REMOVED FOR GRADING AND CONSTRUCTION OF THIS PARTICULAR PLAN.
BUT THEY ARE DOING A LOT OF WORK TO TRY AND EITHER PRESERVE OR REESTABLISH PLANTING OUT THERE TO MAKE SURE THAT THERE ARE SOME MATURE SCREENING TYPE SHRUBBERY AND TREES THAT REMAIN AS THE BUILDING IS CONSTRUCTED.
SWITCHING BACK TO TALKING ABOUT BUILDING HEIGHT DEVIATION, YOU'LL SEE ON THE SCREEN HERE THE FIVE DIFFERENT BUILDINGS WE'VE GOT BUILDING ONE, TWO, THREE, FOUR AND FIVE IN THE PURPLE OR NAVY BLUE HERE, HOWEVER YOU VIEW IT, SOME OF US PREFER PURPLE.
HA HA. HAD TO GET MY ONE JOKE IN TONIGHT.
I'VE BEEN GAVELED. OKAY, SO BUILDING FOUR AND FIVE ALREADY RECEIVED A DEVIATION AT CONCEPT STAGE.
IF YOU IF YOU RECALL THEY'RE A MAXIMUM OF 48FT HIGH IN BUILDING HEIGHT.
AND THEY WERE APPROVED FOR JUST THAT EAST SIDE OF THE BUILDING.
BECAUSE OF REFINING THE PLAN BETWEEN CONCEPT STAGE AND PRELIMINARY STAGE, THE APPLICANT NOW IS REQUESTING ADDITIONAL HEIGHT DEVIATIONS FOR THESE AREAS IN ORANGE ON BUILDING TWO AND THREE, AND THAT WOULD BE FOR THE SAME TYPE OF DEVIATION AS FOUR AND FIVE.
SO IT'S ABOUT A 13 FOOT DIFFERENCE FROM WHAT THE CODE ALLOWS, BUILDING ONE AND THE WEST SIDES OF ALL OF THESE BUILDINGS THAT YOU SEE IN THE TAN COLOR WOULD REMAIN AT THREE STORIES. SO, AGAIN, THIS IS JUST DUE TO THE TOPOGRAPHY.
THE APPLICANT PROVIDED SEVERAL IMAGES AND PERSPECTIVES OF THIS TO GIVE US A BETTER LOOK AT IT.
AND EVEN THOUGH BUILDING THREE AND FOUR ARE THE ONES THAT HAVE FOUR STORIES ON THE EAST SIDE HERE, THEY'RE ACTUALLY SHORTER THAN THIS THREE STORY BUILDING. IF YOU LOOK AT THEM FROM K-10.
SO THERE'S A GOOD PERSPECTIVE OF THE ELEVATION CHANGE FOR THOSE BUILDINGS.
AND YOU CAN SEE THESE ARROWS INDICATE SORT OF WHAT YOUR VIEW IS THAT YOU'RE LOOKING AT ON TOP HERE.
SO THE APPLICANT PROVIDED THIS PERSPECTIVE AS WELL.
IT'S ACTUALLY ONE OF THE HIGHER ONES, I BELIEVE.
AND YOU CAN SEE ON TOP OF THE SCREEN HERE IS THAT A HOME AND ITS EXISTING HEIGHT.
AND AS IT LOOKS OVER ACROSS 99TH STREET, YOU WOULD SEE FUTURE CONSTRUCTION OF WHAT'S LIKELY TO BE MAYBE A ONE STORY TOWNHOME IN THIS B AREA HERE IN THIS SEPARATE TRACT.
IT'S NOT BEEN PRELIMINARY PLANNED OR FINAL PLANNED YET.
AND THEN 99TH PLACE LOOKING THIS WAY AND C WHICH WOULD BE THIS BUILDING HERE THAT AS YOU RECALL, IS JUST THREE STORIES RIGHT HERE AND THEN MOVES DOWN TO THE FOUR STORIES PROPOSED ON THE SOUTH SIDE, THE SOUTHEAST SIDE OF THE BUILDING.
SO IF YOU LOOK AT THIS SITE LINE, BASICALLY FROM THE WINDOWS OF THE HOUSE ON A ACROSS, IT'S ALIGNING WITH JUST ABOUT THE TOP OF THE ROOF ON BUILDING C, WHICH IS THAT THREE STORY PART OF THAT BUILDING.
[00:55:01]
THERE IS A FREEWAY SETBACK DEVIATION THAT'S NECESSARY.WE HAVE 100 FOOT SETBACK REQUIREMENT FROM FREEWAYS.
IN THIS CASE, YOU CAN SEE THAT 100 FOOT ZONE DENOTED IN GREEN AND THE APPLICANT IS PROPOSING TO SET BACK JUST THE DRIVE AISLE ANYWHERE BETWEEN 42FT AND 60FT, AS YOU SEE IN RED WITH THOSE MEASUREMENTS.
SO FOR THIS WE WERE STAFF WAS VERY STRONG ON MAKING SURE THAT THE BUILDING WOULD NOT ACTUALLY BE WITHIN THE 100FT, THAT THE PARKING WOULD NOT BE WITHIN 100FT.
THE CONCEPT PLAN REALLY JUST SHOWED A DRIVE AISLE.
SO WE MADE SURE THE APPLICANT STUCK WITH JUST THE DRIVE AISLE IN ORDER TO BE CONSISTENT WITH WHAT WAS SHOWN AT THE CONCEPT STAGE AND ALSO WHEN THE PROPERTY WAS ORIGINALLY REZONED AND HOW THAT PUBLIC NOTICE AND THE PUBLIC WAS ABLE TO SEE THAT ORIGINAL PLAN.
SO IN ORDER TO MITIGATE THE LESSER SETBACK FOR JUST THE DRIVE AISLE HERE, THE APPLICANT IS GOING TO PROVIDE ADDITIONAL LANDSCAPING ALONG THE K-10 HIGHWAY BUFFER AREA THERE IN THAT 40 SOME ODD TO 60 SOME ODD FEET THAT'S LEFT.
AND HERE IS ANOTHER ILLUSTRATION OF THAT FREEWAY SETBACK.
THIS WAS WHAT WAS SHOWN AT THE CONCEPT PLAN STAGE.
SO WE NOTED IN HERE THAT THAT DRIVE AISLE WOULD LIKELY NEED A SETBACK.
AND STAFF AND THE PLANNING COMMISSION DO RECOMMEND APPROVAL OF THIS PRELIMINARY PLAN AND PLAT FOR CANYON CREEK APARTMENT HOMES FOR A MULTI FAMILY RESIDENTIAL USE WITH THE DEVIATIONS FOR BUILDING HEIGHT AND FREEWAY SETBACK AS NOTED IN THIS PRESENTATION AND THE STAFF REPORT.
THAT CONCLUDES MY PRESENTATION.
THANK YOU. THANK YOU, STEPHANIE.
AARON, ARE YOU LEADING OFF OR SOMEONE FROM YOUR TEAM? THERE YOU GO. MY NAME IS DAN SILER.
THAT WAS INCREDIBLY THOROUGH AND I THINK SHOWS HOW HARD ALL THE PEOPLE THAT ARE HERE WITH US TODAY HAVE BEEN WORKING WITH PLANNING STAFF THAT WAS RECOGNIZED AT THE BEGINNING OF THIS MEETING. WE'RE VERY EXCITED ABOUT WHAT WE PRESENTED TO YOU.
MRE CAPITAL IS A FIRM BASED IN KANSAS CITY.
WE'VE BEEN HERE OUR WHOLE LIVES.
SO WE ENJOY THOSE JOKES AS WELL.
SOME OF US MORE THIS WEEK THAN LAST WEEK.
WE LIVE HERE. OUR KIDS LIVE HERE.
WE ARE GOING TO BUILD SOMETHING WE'RE PROUD OF.
AND AND WE'VE BEEN DOING THAT FOR ALMOST TWO DECADES NOW.
AND THIS WILL BE OUR 35TH DEVELOPMENT.
AND WE'RE EXCITED FOR IT TO BE JUST DOWN THE STREET.
I JUST HAVE A COUPLE OF THINGS TO ADD TO STEPHANIE'S PRESENTATION, SO BEAR WITH ME HERE.
FIRST OF ALL, ON THE AMENITY PACKAGE SHE MISSED, INCLUDING THE PLAYGROUND.
WE DO HAVE A PLAYGROUND HERE AS WELL.
AND QUITE FRANKLY, THE CURRENT OWNER WAS WHAT DO I DO WITH THIS PIECE THAT GOT KIND OF SANDWICHED BETWEEN THE STREAM CORRIDOR AND THE 100TH STREET RIGHT OF WAY. AND WHEN WE CAME THROUGH WITH THE CONCEPT PLAN, WE HAD TO SHOW SOMETHING.
AND THEN THE PLAYGROUND IS ALSO FROM 98TH PLACE HERE, WHICH WILL BE IS PUT IN PLACE TO PROVIDE A FUTURE CONNECTION TO RP-2 TO THE EAST.
THE TRAIL, JUST TO POINT OUT WHERE IT IS, IS ALONG THIS EAST SIDE OVER HERE.
WE'RE PLANNING TO HAVE SOME STATIONS THERE, SOME ACTIVITY STATIONS.
[01:00:04]
IT'S BUILT THERE BECAUSE OF TERRAIN.AND JUST THAT'S THE EASIEST PATH FOR US TO TRY TO GET OVER TO THE EXISTING SANITARY SEWER CORRIDOR.
THAT'S BEEN CLEAR CUTTED TO BE ABLE TO GET ON TO THAT AS QUICKLY AS POSSIBLE.
AND THEN THE OTHER AMENITIES ARE ALONG THE BACK OF THESE BUILDINGS, WHICH ARE SOME HAMMOCK GARDENS.
AND THEN WE'VE GOT AN OUTDOOR PATIO SPACE THAT HAS AREAS FOR BAG GAMES AND PICNIC TABLES AND THAT TYPE OF THING. SO I JUST WANTED TO POINT THOSE OUT REAL QUICK ON HERE.
THE OTHER THING TO NOTE ON THIS IS THE IT DIDN'T REALLY SHOW UP MUCH IN THE GRAPHICS THAT WERE PRESENTED IN STEPHANIE'S, BUT THIS IS A VISUAL OF THE SITE PLAN OVERLAID ON TOP OF THE AERIAL PHOTOS.
SO YOU CAN ACTUALLY SEE THE NUMBER OF EXISTING TREES THAT WE ARE PRESERVING ON THIS SITE.
AND WHAT I WANTED TO NOTE WAS WE'RE NOT ONLY PRESERVING THE TREES ALONG HERE, WE'RE BUILDING AN ADDITIONAL INSTALLING ADDITIONAL ROW OF MIXTURE OF EVERGREENS AND A FEW DECIDUOUS.
SO WE ESSENTIALLY HAVE THREE DIFFERENT ROWS OF BUFFERING GOING ON ALONG THAT PARTICULAR FRONTAGE.
AND THEN THAT'S PART OF THAT SETBACK DEVIATION REQUEST.
AND THIS IS ACTUALLY WE HAVE CONSIDERABLY MORE SETBACK THAN WHAT'S BEEN ALLOWED ON SOME OTHER PROJECTS IN RECENT YEARS AS FAR AS BOTH COMMERCIAL, RESIDENTIAL, THAT KIND OF THING.
AND THEN AS FAR AS THE BUILDING HEIGHT DEVIATION, PART OF IT WAS A FURTHER MOST OF IT WAS A FURTHER REFINEMENT AND UNDERSTANDING OF WHAT TOPOGRAPHY WAS OUT THERE.
SOME OF THAT WAS ALSO THIS PARKING LOT WE ACTUALLY REDUCED.
IF YOU NOTICE, THERE WERE THREE AISLES HERE WITH PARKING.
WE'VE ACTUALLY SHRUNK THAT PARKING LOT DOWN BECAUSE WE FOUND THAT WE WERE A LITTLE BIT OVER PARKED IN THAT AREA, WHICH ESSENTIALLY MOVED THE BUILDINGS EAST FARTHER DOWN THE SLOPE AND MADE THAT SITUATION A LITTLE BIT MORE SIMILAR TO WHAT WE WERE EXPERIENCING ON THE BUILDINGS ALONG THE EAST SIDE. BUT AGAIN, YEAH, LIKE STEPHANIE SAID, ONCE WE REALLY GOT INTO IT AND LOOKED AT THE SLOPE AND YOU COULD SEE IT ON THAT K-10 SECTION THAT SHE PUT UP, IF YOU REALLY LOOK AT THAT, YOU CAN SEE THE SLOPE COMING ACROSS.
YOU CAN SEE HOW THE BUILDINGS ARE STEPPING DOWN.
WHETHER WE GO DOWN ANOTHER STORY OR NOT, THEY'RE ALWAYS GOING TO BE AT THAT SAME LEVEL.
WE'RE NOT WE'RE NOT INCREASING THE HEIGHT THERE AT ALL.
SO THAT'S ALWAYS GOING TO BE THE VIEW FROM THAT PARTICULAR STREET.
AND THEN THIS WAS JUST SOME BIRD'S EYE VIEWS THAT WE PRESENTED THAT WERE PART OF THE PRESENTATION.
SO IT'LL BE FACING 100TH STREET.
SO WHEN YOU COME IN OFF OF 100TH STREET, YOU'LL BE ABLE TO GET RIGHT TO IT.
AND IT FITS IN CLOSE PROXIMITY TO THE AMENITY AREA ALONG THE PLAYGROUND IN CLOSE PROXIMITY TO THE THE PATIO AREA AS WELL.
AND THEN SHE ALREADY COVERED THE BUILDING MATERIALS.
AND THEN I ALREADY COVERED THE SITE AMENITIES WHERE THEY'RE AT.
THIS IS THE PLAYGROUND, AND THIS IS JUST REPRESENTATIVE OF THE EQUIPMENT THAT WE'RE LOOKING AT PUTTING ALONG THE TRAIL, NOT NECESSARILY ALL GROUPED TOGETHER LIKE THAT, MAYBE ONE PER STATION AND THEN A CONCEPT FOR THE MONUMENTATION WE WANT TO TRY TO DO IS TAKE SOME OF THE MATERIALS THAT HAVE BEEN USED OUT THERE AND THE STYLE AND TRY TO BLEND IT SO THAT IT BECOMES PART OF THE OVERALL CONCEPT OUT THERE AND NOT COME UP WITH JUST A WHOLE NEW PALETTE
[01:05:01]
OF MATERIALS.AND WITH THAT, WE'D BE HAPPY TO ANSWER ANY OTHER QUESTIONS YOU MIGHT HAVE.
MY ONLY QUESTION IS WHEN DO WE START? WELL, WE'VE ALREADY SUBMITTED THE FINAL PLAT, SO IT'S COMING UP THROUGH THE PROCESS RIGHT NOW WE'RE ON SCHEDULE TO SUBMIT THE FINAL PLAN BY OCTOBER 2ND.
SO 12-18 MONTHS BUILD HOW LONG? SINCE WE'RE BUILDING 100TH STREET ALSO, WE'LL ACTUALLY NEED TO BUILD 100TH STREET FIRST TO GET THE WATER SYSTEMS IN TO ALLOW US TO GO UP WITH COMBUSTIBLES.
SO IT'S PROBABLY GOING TO BE ABOUT 20 MONTHS IN TOTAL.
THANK YOU. 4 OR 5 MONTHS OF ROAD CONSTRUCTION, SOUNDS GREAT.
MELANIE? I AGREE WITH JULIE THAT THE VISUALS ARE VERY HELPFUL, SO WE REALLY APPRECIATE THAT.
AND I REMEMBER WHEN WE HAD THIS CONVERSATION A FEW MONTHS AGO OR VAGUELY REMEMBER HOW THE HEIGHT OF THE BUILDINGS IN CERTAIN ASPECTS OF THAT WAS A COST OF LENGTHY CONVERSATION HERE, I'LL PUT IT THAT WAY.
SO IT JUST REALLY FEELS NICE TO BE ABLE TO COLLABORATE.
UM, MY ONLY QUESTION IS JUST THINKING ABOUT WHERE THE FUTURE IS HEADED.
ARE YOU GUYS THINKING OF IMPLEMENTING CHARGING STATIONS FOR VEHICLES? YEAH, I FORGOT WHAT YOUR ANSWER WAS THE LAST TIME THAT WAS ASKED LAST TIME.
AND WE AND WE SAID WE'RE GOING TO LOOK INTO IT.
WE'VE GOT TO TALK TO EVERGY AND FIGURE OUT WHAT'S WHAT'S POSSIBLE ON THE SITE.
THAT'S KIND OF A NEW CONCEPT FOR AT LEAST FOR US.
AND BUT WE'LL DEFINITELY EXPLORE THAT OPTION.
YEAH. THANK YOU. I'M GLAD THAT YOU GUYS ARE OPEN TO IT.
AND YOU EXPLAINED IT VERY WELL IN TERMS OF THE READJUSTMENT AND SO FORTH.
SO MY COMPLIMENTS TO TO ALL OF THE PRESENTATIONS TONIGHT.
I THINK THEY COMPLEMENTED EACH OTHER VERY WELL.
I'LL SUPPORT IT. I THINK IT LOOKS GREAT.
I THINK IN THE FIRST FEW ROUNDS WE WERE MORE IN THE CONCEPT OF IT AND THEN THE REALITY OF THE TOPOGRAPHY KICKED IN AFTER YOU GOT OUT THERE AND STARTED DOING THE SURVEYS.
AND I THINK I LOOKED AT IT, IT'S ALMOST A 90 FOOT DROP ACROSS THE SITE AND THERE'S A LOT OF THESE SWITCHBACK SIDEWALKS.
SO THAT JUST TELLS US THAT THIS PROBABLY THINK YOU'RE IN THE OZARKS FOR THIS ONE.
I THINK YOU'VE YOU DIDN'T OVERDO IT.
I REALLY LIKE SOME OF THE ITEMS THAT YOU'VE INTEGRATED HERE.
ADDITIONAL PARKING, LANDSCAPING, THE CLUBHOUSE ON THE END CAP AND EVEN KIND OF TURNING WHAT I WOULD THINK IS MAYBE A CHALLENGE ON YOUR NORTHERN PEAK THERE INTO A REAL AMENITY THAT'S GOING TO BE A REAL BENEFIT.
SO GOOD JOB, REALLY APPRECIATE ALL OF THE EFFORT.
TREMENDOUS AMOUNT OF NOT ONLY ON THE ENGINEERING SIDE BUT ON THE ARCHITECTURAL SIDE, MATERIALS, CONSTRUCTION, DEVELOPMENT, ALL GOOD THOUGHTS. THANK YOU.
AND PLANNING STAFF AND PLANNING, STEERING THANKS, TOM. ANYONE ELSE? BILL YES, THANK YOU, DAN THANK YOU, STEPHANIE.
IN FACT, ONE OF US ASKED, ARE WE GOING TO LIMIT IT TO TWO BUILDINGS? AND OF COURSE, STEPHANIE SAID YES, BUT YEAH, THEY CAN ALWAYS COME BACK FOR ANOTHER DEVIATION.
AND AT THE PLANNING COMMISSION MEETING IT WAS THE MOST OF THE CONVERSATION ABOUT THE ADDITIONAL HEIGHT WAS ELIMINATING RETAINING WALLS.
[01:10:01]
THAT'S CORRECT, YES. AND ONCE AGAIN, I DIDN'T UNDERSTAND IT.I DIDN'T HAVE STEPHANIE'S CHART.
AND HE SHOWED ME A PHOTOGRAPH OF THOSE APARTMENTS EAST OF [INAUDIBLE].
AND INSTEAD OF HAVING A RETAINING WALL AND GRASS AND THEN THREE STORY'S, LET'S TAKE THAT DOWN, HAVE FOUR STORY'S AND PARKING.
YEAH, ESPECIALLY THAT WE DIDN'T INCREASE DENSITY.
WE'RE ONLY DEVELOPING 16 OF THIS RP-4, SO I WOULD HOPE AND WOULD TRUST THE FUTURE CITY COUNCIL, THE FUTURE PLANNING COMMISSION, THE STAFF THAT WHEN THAT EIGHT ACRES COMES IN, THAT WE'RE LOOKING AT THE 13.1 DWELLINGS PER UNIT THAT WE APPROVED AT YOUR CONCEPT PLAN, WHICH EVERYBODY WAS ALL ABUZZ THAT BOY, THIS IS ALMOST A PRELIMINARY PLAN.
SO MUCH DETAIL BECAUSE OF THE 90 FOOT DROP.
SO LIKE I SAY, I THINK WE SHOULD LOOK AT THAT 13.1 THAT WE APPROVED RATHER THAN THE 16 T HAT KEEPS TO MY MIND BEING REFERENCED AS RP-4 16 DWELLINGS PER DWELLINGS PER ACRE. SO ONCE AGAIN, I AGREE.
IT SURE MAKES SENSE TO GET THIS DEVIATION, BUT THE [INAUDIBLE] HAS YET TO COME.
COURTNEY? THANK YOU FOR BRINGING THIS TONIGHT.
I LOVE THE CHANGES THAT WERE MADE.
I THINK THAT THE DOG PARK WILL BE A DRAW FOR PEOPLE WHO WANT TO LIVE IN THIS AREA, ESPECIALLY BECAUSE IT'S AT THE ACTUAL SITE OF THE APARTMENTS INSTEAD OF HAVING TO LOAD UP YOUR DOGGIE AND TAKE IT TO THE PARK.
I THINK THAT'S KIND OF SOMETHING WE DON'T SEE VERY OFTEN YET HERE.
I SEE IT ALL THE TIME ON TV SHOWS, BUT NOT BUT NOT HERE.
AND SO I WAS KIND OF EXCITED TO SEE THAT.
I TOO APPRECIATE THE CREATIVITY AROUND GETTING WHAT YOU NEED FROM THE TOPOGRAPHY AND UTILIZING THE SPACE A LITTLE BETTER INSTEAD OF JUST MAKING A BIGGER PARKING LOT.
AND SO I WILL BE VOTING IN SUPPORT.
THANK YOU. THANK YOU. FINAL CALL.
I CHECKED UP YOUR WEBSITE A COUPLE OF WEEKS AGO.
WHERE HAVE YOU BEEN THE LAST 20 YEARS? NOT IN THE METROPOLITAN AREA.
YOUR PROJECTS LOOK GREAT WHEREVER YOU'VE TAKEN THEM.
I THINK IF YOU LOOK AT OUR INFRASTRUCTURE OUT WEST, WE RESPECTED THE CONTOURS OF THE LAND AS WE BUILD OUR INFRASTRUCTURE WITH PRAIRIE STAR NOT GOING 95TH STREET STRAIGHT THROUGH, BUT MEANDERING THROUGH THE HILLS.
SO THANK YOU AND THANKS TO STAFF FOR CONTINUING TO AND WORKING WITH STAFF AND THAT'S IMPORTANT.
SECOND BY I THINK I HEARD DAN DOWN THERE.
ALL IN FAVOR? AYE. ANY OPPOSED MOTION CARRIES.
THANK YOU. BEFORE YOU ALL JUMP UP, WE GO AHEAD.
I'M SORRY. I'M I DIDN'T EVEN USE THAT GAVEL.
I WANT TO DO A SHOUT OUT RIGHT NOW.
AND WE'RE NOW 45 MINUTES LATER.
AND HE SAT THROUGH A LOT OF COOL THINGS TONIGHT.
OKAY. I NEED I NEED YOUR NAME.
THANK YOU. AND YOU'RE A SCOUT, OBVIOUSLY.
WHAT'S YOUR TROOP NUMBER? TROOP 284, 284.
EXCELLENT. AND WHERE DO YOU ALL MEET? TANNERS OR DAD GETS THAT ON ANTIOCHIAN CHURCH.
[01:15:04]
OKAY. OKAY. EXCELLENT.YOU LIVE IN LENEXA? YES. OKAY.
AND WHAT'S YOUR BADGE YOU'RE WORKING ON THIS EVENING? I AM WORKING ON CITIZENSHIP IN THE COMMUNITY.
EXCELLENT. DID YOU LEARN ANYTHING TONIGHT? UH, HE'S WEIGHING HIS OPTION.
IF HE SAYS YES, HE KNOWS I'M GOING TO ASK, WHAT? IF HE SAYS NO HE GETS TO SIT DOWN.
SO PROBABLY MORE THAN HE REALIZED.
OKAY. OKAY. WELL, I'M SURE WITH DAD'S COACHING TONIGHT.
THANK YOU FOR COMING OUT TONIGHT.
I'M SORRY I DIDN'T RECOGNIZE YOU SOONER [APPLAUSE].
OKAY. NO NEW BUSINESS THIS EVENING, COUNCIL MEMBER REPORTS.
[COUNCILMEMBER REPORTS ]
DAN I'LL BE QUICK.I WANT TO FOCUS A LITTLE BIT ON THE THE FIRE DEPARTMENT'S OPEN HOUSE THIS PAST SATURDAY.
A RESIDENT KIND OF WHATEVER WALK UP TO ME.
IT'S AN INCREDIBLE EXPERIENCE.
THE THINGS THAT THEY DO ARE JUST INCREDIBLE.
THERE'S LITTLE KIDS EVERYWHERE WANTING TO BE FIRE PEOPLE AS THEY GROW UP.
HE SAID THE THINGS THAT JUMPED AT HIM WERE KNOWLEDGE AND ENTHUSIASM.
AND THE MOST IMPORTANT THING HE TOLD ME IS, IS I FEEL SAFER HAVING COME TODAY.
I REALLY DO. SO, CHIEF, THANK YOU.
ANYONE ELSE? JOE? DITTO TO EVERYTHING DAN SAID SOME REALLY COOL EVENTS THIS WEEK AND COMPLIMENTS AND THANK YOU TO THE COMMUNITY PLANNING STAFF, WHETHER IT'S BUILDERS, DEVELOPERS OR MY NEIGHBOR NEXT DOOR WHO'S BUILDING A DECK AND GOT A PERMIT.
NOTHING BUT RAVE REVIEWS, JUST COMMENTS THAT YOU GUYS ARE GREAT TO WORK WITH.
KNOW WHAT YOU'RE TALKING ABOUT AND WORK TO FIND.
YES. SO IT'S APPROPRIATE THAT WE RECOGNIZE YOU NEXT MONTH AND APPRECIATE ALL YOU DO.
COURTNEY. I TOO HAD THE OPPORTUNITY TO GET TO SPINACH FEST AND JUST WANTED TO SHARE THAT A COUPLE OF THE COMMENTS FROM THE VENDORS THAT WERE THERE WERE THAT THEY REALLY LIKED THE SETUP ON THIS SIDE OF THE POND THIS YEAR THAT IT WAS AND THE WEATHER WAS PERFECT.
AND THEY HAD A HAD A REALLY GOOD TIME AND WANTED TO SEE THAT AGAIN.
GRAND OPENING WAS SIMPLY AMAZING.
SO GLAD TO SEE THAT WE COULD DO THAT THIS WEEK.
AND I HOPE EVERYBODY AT LEAST DRIVES BY AND SEES EVERYBODY ENJOYING IT.
THANKS, COURTNEY. ANYONE ELSE? I GOT AN EMAIL ABOUT, WELL, A FEW HOURS AGO.
I WANT TO READ IT TONIGHT BECAUSE I THINK IT'S APPROPRIATE.
IT SHINES A LIGHT ON ALL OF OUR STAFF IN GENERAL, BUT I SENT IT FIRST TO NICK ARENA THINKING IT WAS ONE OF HIS FOLKS AND HE GRACIOUSLY SAID NOT MINE, REFERRED IT ON TO LOGAN. I THINK HE SHARED IT WITH LOGAN SINCE THEN.
BUT I WANT TO JUST READ THIS FROM ONE OF OUR RESIDENTS.
THIS EMAIL IS TO GIVE SOME RECOGNITION TO THIS FELLA.
I'M SORRY I GOT THIS SO SMALL.
ASKED HIM WHETHER HE WAS A CITY WORKER OR AN OUTSIDE CONTRACTOR.
HE SAID HE WAS A CITY, A CITY WORKER, AND HIS NAME WAS EDUARDO.
ALTHOUGH MOST PATRONS OF THE SPINACH FESTIVAL GO ABOUT THEIR HAVING THEIR DAY, HAVING FUN WITH THEIR FAMILY, I AM ONE GRATEFUL CITIZEN RESIDENT OF LENEXA WHO NOTICED MY TAX DOLLARS AT WORK AND WANTED TO PASS ALONG AN ATTABOY TO A FELLOW WHO LIKELY NEVER GETS A PAT ON THE BACK.
I DISPUTE THAT BECAUSE I KNOW WE DO THAT.
BUT FOR COLLECTING TRASH AND WHATEVER ELSE, WHATEVER ELSE MENIAL TASKS, JOBS HE MAY BE ASSIGNED.
ALL WORK IS HONORABLE AND ALL GOOD WORK IS WORTHY OF RECOGNITION.
[01:20:02]
HERE. YES, SIR.[STAFF REPORTS ]
JUST A COUPLE. FIRST OF ALL, THANK YOU ALL FOR YOUR ATTENDANCE AND SUPPORT AND ALL THE GREAT EVENTS THAT WE'VE BEEN HAVING.IT HAS BEEN A VERY BUSY TIME AND OUR TEAMS ARE CONTINUING TO DO A FANTASTIC JOB WITH THOSE EVENTS.
SO COME OUT IF YOU'RE ABLE TO DO THAT.
WE SHOULD HAVE LIVE MUSIC, WONDERFUL FOOD AND VENDORS GALORE.
I'LL GET MORE INFORMATION WITH MORE DETAILS OUT TO YOU LATER THIS WEEK.
AT THE LENEXA JUSTICE CENTER WITH A HARD HAT TOUR.
SO WE'LL PLAN TO SEE YOU THERE.
AND FROM THERE, WE'LL ADJOURN OVER TO THE THOMPSON BARN AND MORE DETAILS WILL BE FORTHCOMING.
WE LOOK FORWARD TO SPENDING SOME TIME WITH YOU.
THANKS, BECKY. AND THIS WILL END OUR RECORDED PORTION OF OUR MEETING THIS EVENING.
THIS TIME, WE'LL RECOGNIZE ANY CITIZENS HERE.
BUSINESS FROM THE FLOOR. ANYONE LIKE TO ADDRESS THE GOVERNING BODY, PLEASE COME FORWARD
TO THE MICROPHONE.
* This transcript was compiled from uncorrected Closed Captioning.