[00:00:01]
OH, WE'LL CALL THE MEETING TO ORDER.
[CALL TO ORDER]
I'D LIKE TO INVITE THE CUB SCOUTS.ARROW OF LIGHT TROOP 3136 TO COME FORWARD AND LEAD US IN THE PLEDGE TONIGHT.
WHEN YOU'RE ALL READY, PLEASE PROCEED.
NOW, GUYS, IF YOU WOULD FACE THE AUDIENCE.
JONAH, I BELIEVE IT IS, IS HERE ON MY RIGHT.
WOULD YOU GIVE YOUR NAME TO THE AUDIENCE? BY THEIR FELLOW SCOUT LEADERS, ONE OF WHICH IS A LENEXA FIREMAN.
SO WE'RE PLEASED TO HAVE SPECIAL GUEST TONIGHT WHEN WE'RE RECOGNIZING OUR SCOUTS AS WELL.
GUYS, THANKS FOR COMING OUT TONIGHT.
WE ENJOYED OUR VISIT. [APPLAUSE] JENNIFER, WOULD YOU CALL ROLL, PLEASE? THANK YOU, MAYOR.
[APPROVE MINUTES]
WE HAVE THE MINUTES FROM THE AUGUST 1ST MEETING FOR APPROVAL THIS EVENING.MOTION BY CRAIG. SECOND BY JULIE.
AYE. ANY OPPOSED? MINUTES ARE APPROVED. ANY MOTION OR MODIFICATIONS THIS EVENING? NONE THIS EVENING. ALL RIGHT.
WE'LL MOVE ON TO APPOINTMENTS.
[APPOINTMENT]
CARA WAGNER IS IN THE BACK ROW OVER THERE.WE'RE GOING TO BRING HER UP HERE STARTING THE FIRST PLANNING COMMISSION.
YOU CAN STAY THERE FOR TONIGHT, BUT I'M PLACING BEFORE YOU THE NAME CARA WAGNER.
AND I PUT IN A MEMO IN THERE FOR COVER MEMO ON PAGE 63 THAT GIVES YOU A LITTLE SYNOPSIS AND SUMMARY.
CARA WAS BORN IN SOUTHWEST MISSOURI, MOVED TO LENEXA WITH HER PARENTS.
I SHOULD PUT IT IN MY MEMO. HER FAMILY, BUT THERE'S ANOTHER FAMILY STILL LIVING HERE.
WHEN SHE WAS FOUR YEARS OLD, WENT THROUGH THE SHAWNEE MISSION SCHOOL DISTRICT AND THEN WENT ON OFF TO A WONDERFUL PLACE DOWN THE [INAUDIBLE] HERE WITH RED AND BLUE COLORS AND A BEAUTIFUL LITTLE BIRD AS A MASCOT AND GRADUATED WITH HER ENGINEERING DEGREE AND CAME RIGHT BACK TO LENEXA WITH HER HUSBAND.
MOVED A FEW HOUSES DOWN THE STREET FROM WHERE SHE GREW UP AND HAS BEEN HAD AN INTERNSHIP WITH KIEWIT AND HER, I BELIEVE SENIOR YEAR, THEN GRADUATED AND CAME RIGHT BACK TO WORK FOR KIEWIT, WHERE SHE'S BEEN EVER SINCE.
SO VERY FAMILIAR WITH LENEXA FOR, I'LL SAY 15 PLUS YEARS.
OKAY. AND IT'S SEEN A LOT OF GROWTH AND CHANGE AND BRINGS A LOT OF SKILLS AND TO OUR ORGANIZATION AND WHAT I'LL CALL THE METHODICAL MIND OF AN ENGINEER BUT HAS NOTHING TO DO WITH REALLY DEVELOPMENT RIGHT NOW.
SO SHE'S NOT GOING TO BE TRYING TO DO SCOTT'S JOB AND TIM GREEN'S JOB FROM FROM UP HERE.
SO BUT I WOULD LIKE TO RECOMMEND CARA WAGNER FOR APPOINTMENT TO THE PLANNING COMMISSION.
THE TERM IS A FULL TERM, SO IT'LL BEGIN IMMEDIATELY AT THE NEXT MEETING.
AND SOMEWHERE IN MY MEMO THROUGH FEBRUARY OF 26 WHEN SHE WOULD BE ELIGIBLE FOR REAPPOINTMENT.
MOTION BY JULIE. SECOND BY JOE.
AYE. ANY OPPOSED? CARA, I SEE YOU BROUGHT SOMEONE WITH YOU.
SO I TOLD YOU I WOULDN'T MAKE YOU SPEAK.
BUT WOULD YOU LIKE TO INTRODUCE YOUR GUEST HERE TONIGHT? YES. THIS IS MY HUSBAND, JOE.
[CONSENT AGENDA]
CONSENT AGENDA IS THE NEXT ITEM.IT'S ITEMS ONE THROUGH SIX ON THE AGENDA.
ALL MATTERS LISTED WITH THE CONSENT AGENDA HAVE BEEN DISTRIBUTED TO EACH MEMBER OF THE GOVERNING BODY FOR REVIEW OR CONSIDERED TO BE ROUTINE AND WILL ACTED ON BY ONE MOTION WITH NO SEPARATE DISCUSSION.
I NEED TO REMOVE WHICH ONE DID I TELL YOU, BECKY, NUMBER TWO? NUMBER TWO AS I HAVE A POTENTIAL CONFLICT OF INTEREST ON THAT ONE.
SO ONE, THREE, FOUR, FIVE AND SIX TONIGHT.
ANY OPPOSED. SO CONTENTS INTENT.
[00:05:02]
I'M NOT GETTING IT OUT. CONSENT AGENDA MINUS NUMBER TWO HAS BEEN APPROVED.[2. Bid award to Infrastructure Solutions for the 2023 Pavement Management Program Residential Concrete Panel Replacement Project]
AND JOE I'LL TURN THE MEETING OVER TO YOU TO RUN ITEM NUMBER TWO.IS THERE ANY DISCUSSION ON AGENDA ITEM TWO? MOVE BY JULIE, SECONDED BY CRAIG? ALL THOSE IN FAVOR.
AYE. OPPOSED. ITEM NUMBER TWO PASSES.
[BOARD RECOMMENDATIONS]
THANK YOU, JOE. ITEM NUMBER SEVEN IS CONSIDERATION OF A REZONING AND PRELIMINARY PLAN.PRELIMINARY/FINAL PLAN FOR RETAIL OFFICE, PERSONAL INSTRUCTION, GENERAL AND WHOLESALE WAREHOUSING, GENERAL AND LIMITED USES AT 8500 MARSHALL DRIVE.
SEVEN A IS AN ORDINANCE REZONING PROPERTY FROM BP2, PLAN MANUFACTURING ZONING DISTRICT TO CP4, PLANNED SERVICE COMMERCIAL ZONING DISTRICT AND SEVEN B IS APPROVAL OF A COMPANION PRELIMINARY/FINAL PLAN FOR 3500 MARSHALL DRIVE.
STEPHANIE. HERE WITH COMMUNITY DEVELOPMENT.
AND AS MENTIONED, THE ITEM BEFORE YOU, NUMBER SEVEN THIS EVENING IS A REQUEST FOR REZONING AND PRELIMINARY/FINAL PLAN APPROVAL FOR 8500 MARSHALL DRIVE. YOU CAN SEE ON THE SCREEN HERE, THIS SITE IS LOCATED AT 8500 MARSHALL DRIVE, WHICH IS THE INTERSECTION OF NIEMAN AND MARSHALL, JUST TO THE WEST OF I-35 AND JUST NORTH OF 87TH STREET PARKWAY.
AND THE APPLICANT IS REQUESTING THE REZONING IN ORDER TO ALLOW FOR AN EXISTING TENANT NAMED BUSHNELL TO BASICALLY TRANSFORM THEIR OPERATION FROM MORE OF A WAREHOUSE TYPE USE TO MORE OF A RETAIL TYPE USE TO FIT THEIR BUSINESS MODEL.
AND ON THE FUTURE LAND USE MAP, IT IS DESIGNATED FOR BUSINESS PARK TYPE USES.
THE PROPOSED REZONING IS TO CP4, WHICH IS A COMMERCIAL DISTRICT THAT WOULD ACTUALLY ALLOW THE INDUSTRIAL USES THAT FIT IN THE OTHER TENANT SPACES CURRENTLY WITH RETAIL.
HERE IS ANOTHER AERIAL IMAGE OF THE SITE AGAIN OUTLINED IN RED AT NEIMAN AND MARSHALL DRIVE.
THIS HIGHLIGHTS THE BUSHNELL TENANT SPACE.
YOU CAN SEE THERE IN THE MIDDLE, AND THEY ARE RELOCATED FROM A DIFFERENT SPACE IN THE BUILDING AND THEY'RE PREDOMINANTLY RETAIL AND IT'S JUST UNDER 6000 OR SO SQUARE FEET OF SPACE WITHIN THE BUILDING.
SO THE MAJORITY OF THE BUILDING WILL REMAIN AS INDUSTRIAL TYPE USES.
WITH THIS BEING REALLY THE ONLY RETAIL TYPE USE, I WILL SAY WE DO ALLOW A SMALL AMOUNT OF RETAIL IN INDUSTRIAL SPACES, IN INDUSTRIAL ZONING DISTRICTS, BUT NOT TO THIS SCALE.
SO YOU MAY SEE SOME INDUSTRIAL AREAS THAT HAVE SMALL RETAIL OPERATIONS, BUT I BELIEVE THE CODE ONLY ALLOWS ABOUT A 10% AREA OF THE ENTIRE BUILDING TO BE RETAIL AND THIS WOULD EXCEED THAT.
HERE'S A COUPLE IMAGES OF THE EXISTING BUILDING JUST TO ORIENT YOU.
THE TOP IMAGE IS THE VIEW FROM MARSHALL DRIVE, AND THE BOTTOM IS THE STREET VIEW FROM NIEMAN ROAD.
STAFF AND THE PLANNING COMMISSION DID REVIEW THE CRITERIA FOR REZONING.
AND IT'S THESE 13 ITEMS YOU SEE ON THE LIST HERE SUMMARIZED.
IF YOU'D LIKE FOR ME TO GO OVER ANY OF THOSE EXPLANATIONS, I'M HAPPY TO DO THAT.
IT WOULD ALLOW RETAIL OFFICE PERSONAL INSTRUCTION AND WAREHOUSE USES AT 8500 MARSHALL DRIVE.
SO IT'S A SINGLE LOT AND THEN INSTALL TWO NEW TREES TO MEET LANDSCAPE REQUIREMENTS.
SO WITH THAT, THAT CONCLUDES MY PRESENTATION AND I'M AVAILABLE FOR ANY QUESTIONS.
IS THE APPLICANT HERE, ANY REMARKS?
[00:10:06]
I WAS EXPECTING AN ENGINEER.BUSHNELL CURRENTLY IS IN 15,800FT² THAT BEEN USING IT ABOUT 6000FT² OF THE AREA FOR RETAIL FOR 15 TO 20 YEARS IN THE BACKS OF THE WAREHOUSE.
THEY'RE LIMITING THE WAREHOUSE.
THEY JUST WANT TO KEEP THE SALES PART.
SO THEY'RE GOING FROM 15,800 AND JUST MOVING OVER TO A 5800 SQUARE FOOT SPACE SO THAT THEY'LL HAVE ABOUT 5000FT² OF RETAIL, VERY SMALL WAREHOUSE IN THE BACK.
AND SO WE'RE TRYING TO KEEP A TENANT THAT'S ALREADY HERE UNDER ALLOWED TO CONTINUE ON.
AND THIS TYPE OF ISSUE WITH THE RETAILERS SEEM TO POP UP.
TWO DOORS UP, USED TO BE A RESTAURANT FOREVER.
SO WITH THAT, I'D ASK FOR YOU TO APPROVE THIS IF YOU HAVE ANY QUESTIONS, I'M HERE FOR THAT AS WELL.
THANKS, RICK. QUESTIONS, COMMENTS? NEED A MOTION TO APPROVE THE ORDINANCE REZONING THE PROPERTY FROM BP2 TO CP4.
REPLAT CRAIG MOTION, BILL SECOND.
AYE. ANY OPPOSED, MOTION CARRIES, THANK YOU.
[OLD BUSINESS]
. EIGHT A IS A RESOLUTION AMENDING FISCAL YEAR 2023 TO 2027 CAPITAL IMPROVEMENT PROGRAM, THE CIP AND INCREASING THE BUDGET AMOUNT FOR THE LENEXA OLD TOWN ACTIVITY CENTER IMPROVEMENT PROJECT TO $12,152,000 AND EIGHT B IS A RESOLUTION WAIVING THE SEALED BID PROCESS AUTHORIZING THE MAYOR TO EXECUTE A CONSTRUCTION MANAGER AT RISK AGREEMENT WITH TURNER CONSTRUCTION COMPANY AND APPROVING GUARANTEED MAXIMUM PRICE AMENDMENT NUMBER ONE TO THE CONSTRUCTION COMPANY.LET ME SEE. WHAT'S THAT? CONSTRUCTION MANAGER RISK AGREEMENT FOR CONSTRUCTION OF THE LENEXA OLD TOWN ACTIVITY CENTER IMPROVEMENTS.
THANK YOU, MAYOR. GOOD EVENING, MAYOR.
CITY COUNCIL. LOGAN WAGLER, PARKS RECREATION.
I'M GOING TO BE SPEAKING ON BEHALF OF STAFF TONIGHT, BUT I ALSO WANT TO INTRODUCE OR POINT OUT MIKE NOLAN, OUR ASSISTANT CITY MANAGER, AND BEN CLARK, WHO'S BEEN SERVING AS THE PROJECT MANAGER AS PART OF THE TEAM.
AND WE HAVE CHRISTY TURNER WITH TURNER CONSTRUCTION.
WE TALKED AND I WILL ALL BE AVAILABLE FOR QUESTIONS AT THE END.
WE'LL SPEND A LITTLE BIT OF TIME THERE.
BUT MORE IMPORTANTLY, MARY, YOU ALREADY TOUCHED ON THIS, BUT WE'RE COMING FORWARD FOR FORMAL APPROVAL ON A FEW ITEMS, KIND OF AN A AND B ITEM ASSOCIATED WITH THE PROJECT KEY MILESTONE TONIGHT. SO WE'LL ALSO GIVE SOME MINOR UPDATES AROUND THE PROJECT, INCLUDING THE MURAL PROCESS THAT'S GOING IN PARALLEL WITH THIS WITH THIS PROJECT.
AND THEN WE'LL HAVE THE DESIGN TEAM TALK ABOUT THE DESIGN DEVELOPMENT.
SO REAL QUICK, THIS IS JUST THE PROJECT TIMELINE.
THAT WAS A COMMUNITY DRIVEN PROCESS THAT REALLY LED TO A LOT OF EXCITEMENT ABOUT SOME POTENTIAL RENOVATIONS AND CHANGES DOWN HERE IN OLD TOWN, SPECIFICALLY WITH THIS WITH THIS CAMPUS, WHICH HAVE ULTIMATELY LED TO THE COMMUNITY CENTER, SENIOR CENTER STUDY AND LED TO A FUNDED PROJECT.
THAT FUNDED PROJECT WAS PRIOR TO COVID.
AND REMEMBER, WE HAD HIT THE PAUSE DURING COVID AND WE WERE KIND OF ON A LONG 2 YEAR DELAY.
WE KNEW THAT OUR BUDGET PROBABLY WASN'T APPROPRIATE.
WE WANTED TO REVISIT THE PROJECT, SO WE DID SOME PRE CONSTRUCTION PROGRAMING AND SCHEMATIC DESIGN.
THAT LED TO US WORKING ON DESIGN, DESIGN, DEVELOPMENT AND COST ESTIMATION.
BUT THIS PROJECT'S BEEN A LOT OF WORK BEHIND THE SCENES.
[00:15:01]
I JUST WANTED TO TAKE A MOMENT AND JUST SAY THE TEAM, THE ARCHITECT TEAM, THE CONSTRUCTION TEAM STAFF, THERE'S BEEN A TON OF WORK, A TON OF CONVERSATIONS THAT HAVE GONE ON. I AM SUPER HAPPY.SO REAL QUICK AGAIN, YOU KNOW, WHAT'S DRIVING THE PROCESS AND WHAT WE THINK ABOUT EVERY TIME WE MAKE A DECISION OR THINK ABOUT THE DESIGN OF THE PROJECT IS WE TALK ABOUT THESE PROJECT GOALS. SO AGAIN, WE ALWAYS GOT TO KEEP IN THE FOREFRONT OF WEAVING TOGETHER OLD TOWN, ENHANCING THE OLD TOWN VISIBILITY ACROSS THE ENTIRE COMMUNITY AND BEYOND, CONNECTING TO THE ADJOINING NEIGHBORHOODS, BUILDING AND UPLIFT, A SENIOR COMMUNITY.
THAT WAS A BIG PIECE OF THIS WITH, YOU KNOW, THE CHANGE WITH THE COMMUNITY CENTER AND SENIOR CENTER AND THEN, OF COURSE, IMPROVING OPERATIONS AND MAXIMIZE THOSE RECREATIONAL OPPORTUNITIES, WHICH I THINK IS REALLY HAPPENING.
SO THAT'S KIND OF THE BACKGROUND.
BUT AGAIN, MAYOR, YOU READ THESE OFF, SO I WON'T OVERDO IT ON THESE.
BUT ITEM A, 8 A IS REALLY A CIP BUDGET AMENDMENT.
IF YOU REMEMBER, WE DISCUSSED WHAT WHAT CHANGES WERE HAPPENING, WHAT WE WANT TO DO WITH THE BUDGET.
TONIGHT, WE'RE SEEKING FORMAL APPROVAL OF A CIP BUDGET AMENDMENT OF ABOUT $2.5 MILLION.
SO I WANT TO POINT OUT THAT'S REALLY ENTAILS INFLATION, CONSTRUCTION ESCALATION.
AND OF COURSE, THOSE THREE ITEMS THAT ARE LISTED UP THERE THAT WE TALKED ABOUT WITH THE GOVERNING BODY, AND THAT IS THE REPLACEMENT OF THE SKIN AROUND THE GYMNASIUM AREA OF THE FACILITY, THE ADDITION OF THE YOUTH AND FLEX ROOM ON THE SOUTH END OF THE PROPERTY.
AND THEN, OF COURSE, SOME SORT OF NICE CANOPY FOR THE OUTDOOR SPACE.
ALSO WITH THAT, THE AB ITEM IS APPROVAL OF A CMAR AGREEMENT.
CONSTRUCTION MANAGER AT RISK IS SOMETHING THAT THE COUNCIL AND THE CITY IS VERY FAMILIAR WITH.
AS WE'VE DONE THIS SUCCESSFULLY ON SEVERAL RECENT PROJECTS THAT ARE LISTED THERE.
THE CIVIC CAMPUS WHERE WE'RE STANDING.
THE JUSTICE CENTER THAT'S GOING ON IN SAR-KO-PAR AQUATICS CENTER.
SO WE'LL BE SEEKING APPROVAL FROM THE COUNCIL FOR THAT CMAR CONTRACT WITH TURNER.
THEY'VE ALREADY COMPLETED PRE-CONSTRUCTION SERVICES AND COST ESTIMATION.
AND WITH THAT RELATED TO IT IS WITH APPROVAL OF THAT.
THAT WILL ALSO APPROVE A GMP NUMBER ONE.
SO THE COUNCIL MAY REMEMBER ON OTHER PROJECTS THAT SOMETIMES WILL BRING FORWARD MULTIPLE GMPS.
WE ANTICIPATE BRINGING FORWARD TO GMPS FOR THIS PROJECT.
WE KNEW WE HAD TO DO ONE EARLY AND THAT'S WHAT YOU'LL BE APPROVING TONIGHT.
IT'S ONLY ABOUT 94,000, $95,000.
AND THOSE ARE LISTED UP THERE, HVAC EQUIPMENT, ELECTRICAL GEAR.
THOSE THINGS ARE JUST TAKE A LONG TIME TO GET IN YOUR HANDS.
THE OAK STREET THAT USED TO RUN THROUGH A BIG PORTION OF THIS PROPERTY WAS NEVER VACATED.
WE DECIDED AT THIS TIME, BE BEST TO KIND OF CLEAN THAT PLAT UP.
SO WE'LL BE VACATING THAT RIGHT AWAY.
COMBINE THE WHOLE CITY, THE WHOLE PROPERTY INTO ONE PARCEL, AND THEN WE JUST WANTED TO GIVE THE COUNCIL A HEADS UP BECAUSE THAT WILL BECOME COME BECOME FOR YOU THIS FALL FOR APPROVAL, WHEN THAT'S COMPLETE.
ALSO, AGAIN, MOVING IN PARALLEL IS THE MURAL PROCESS ASSOCIATED WITH THE IMPROVEMENTS AND THE COUNCIL HOPEFULLY REMEMBERS WE DID COMPLETE PHASE ONE, WHICH INCLUDE IDENTIFYING THE MOTIF, MOTIF OR THEME FOR A MURAL, THE APPROPRIATE LOCATION WHICH HAS BEEN IDENTIFIED AND THE POSSIBLE ARTISTS.
IT WASN'T ANYTHING TO DO WITH THE PROJECT.
THEY WERE SUPER EXCITED AND THRILLED TO GET THE INVITATION.
SO THAT WAS ALEXANDER AUSTIN, WHO WAS ONE OF THE THREE.
SO WHAT WE DID IS AS A COMMITTEE, THE PUBLIC ART COMMITTEE GATHERED, WE LOOKED AT THE NEXT TWO ARTISTS ON THE LIST, REVISITED THOSE TWO ARTISTS TOOK A VOTE AND ULTIMATELY DETERMINED TO BRING IN A THIRD ARTIST.
AND THAT ARTIST IS A, ITRA ICON, WHICH IS ACTUALLY TWO ARTISTS IN ONE.
THEY'VE DONE ABOUT 43 MURALS TOGETHER.
IT'S TWO ARTISTS, ISAAC TAPIA AND ROD FIGO ALVAREZ.
SO WE'RE EXCITED TO GET THEM ON BOARD AND HOPEFULLY SEE WHAT NEXT STEPS ARE.
THEY HAVE ABOUT SIX WEEKS TO COMPLETE THOSE RFPS.
[00:20:03]
RETURN THEM BACK IN.WHAT THAT LOOKS LIKE IS WE'LL GET A PHYSICAL MOQUETTE FROM THEM ALL ABOUT THE SAME SIZE AND SHAPE.
WE'LL ALSO GET A DIGITAL VERSION OF THAT AS WELL THAT WE COULD SHARE ON THE WEB, THINGS LIKE THAT, BECAUSE THEN WE'LL IMMEDIATELY GO INTO A COMMUNITY FEEDBACK PROCESS THAT WILL SOLICIT INPUT FROM THE COMMUNITY VIA THE WEB, VIA OPEN HOUSE, YOU KNOW, JUST A VARIETY OF DIFFERENT WAYS TO ENGAGE THE COMMUNITY, GET THEIR FEEDBACK ON WHAT THEY'D LIKE TO SEE AND WHAT THEY LIKE THE BEST.
SO WE'LL GO THROUGH THAT THROUGH THE END OF THE YEAR AND SOMETIME EARLY NEXT YEAR, LIKELY THE FIRST COUNCIL MEETING IN FEBRUARY, WE'LL BE BRINGING FORWARD A RECOMMENDATION TO THE GOVERNING BODY FOR APPROVAL.
I'M GOING TO TURN IT OVER TO SEAN WITH MULTI STUDIO.
THANK YOU, LOGAN. THANK YOU CITY COUNCIL.
SO WHAT WE'RE GOING TO LOOK AT TONIGHT IS VERY MUCH A CONTINUATION OF ALL OF THE CONVERSATIONS AND PRESENTATIONS THAT WE'VE HAD THUS FAR WITH A REAL FOCUS ON MAINTAINING A LOT OF THE GOALS THAT LOGAN HAD DESCRIBED EARLIER.
IN PARTICULAR, RECOGNIZING THAT THIS IS VERY MUCH A PLACE ABOUT CONNECTION AND CREATING CONNECTIVITY, CONNECTING BETWEEN THE NEIGHBORHOODS, OLD TOWN, THE SURROUNDING ENVIRONS, AS WELL AS JUST RECOGNIZING THAT THIS IS AN OPPORTUNITY TO REALLY THINK ABOUT INTERGENERATIONAL CONNECTIVITY.
AND IT'S THOSE ARE THE CENTRAL THEMES BY WHICH WE'VE BEGAN TO LAY OUT AND ORGANIZE THE SITE.
WE'RE GOING TO START WITH THE SITE AND WORK KIND OF FROM THE OUTSIDE INTO THE BUILDING.
AND SO THIS ILLUSTRATES THE CURRENT DEVELOPED SITE PLAN.
A FEW KEY THINGS TO SEE IN THIS.
FIRST OF ALL, IN THE SOUTHWEST CORNER, THERE'S ESSENTIALLY FOUR MAIN ZONES THAT WE'VE BEGUN TO INTEGRATE INTO THE SITE, THAT'S WEST OF THE EXISTING BUILDING WHERE THE OLD SENIOR CENTER AND PARKING LOT USED TO BE.
THE AREA DESIGNATED J, WHICH WAS A SYNTHETIC TURF AREA, BASICALLY AN EXTERIOR RECREATION ZONE.
AND THEN TO THE NORTH OF THAT, AN EXTERIOR, JUST SHUTTLE BALL, SHUTTLE BOARD AND PING PONG COURT AREA THAT BASICALLY ACTS AS AN ANCILLARY AREA TO THE PICKLEBALL COURTS.
AGAIN, PICKING UP ON THIS IDEA OF CONNECTIVITY.
THIS CENTRAL PORTION HERE IS THE FLEX/YOUTH ADDITION THAT'S SURROUNDED BY A LANDSCAPED AREA AND THEN ON THE FARTHEST EAST SIDE IS THE ENTRY, THE HASKINS ENTRY, WHICH IS ESSENTIALLY ACTING AS WHAT WOULD BE THE NEW SENIOR CENTER LOCATION.
THIS IS AN AERIAL VIEW ILLUSTRATING THE PICKLEBALL COURTS AND A FEW THINGS TO NOTE ABOUT THIS.
AS YOU CAN SEE, THIS IS THE AREA THAT WAS PARKING LOT BEFORE.
THE VEGETATION AND THE TREES TO THE RIGHT CREATE A RAIN GARDEN.
THAT RAIN GARDEN ACTS AS A REALLY GREAT SORT OF VISUAL BUFFER BETWEEN TRAFFIC ALONG PLUM STREET AND CREATING SORT OF A NICE EDGE CONDITION ALONG THE EDGE OF THE PICKLEBALL COURTS AS WELL. AND THEN THIS IS A VIEW INSIDE THE PICKLEBALL COURTS.
THEY WILL BE SEPARATED BY FENCES SO THAT BALLS DON'T GO ASTRAY OR ANYTHING.
YOU CAN START TO SEE THE SYNTHETIC TURF AREA TOWARDS THE LEFT OF THE IMAGE WHERE THEY'LL BE FESTOON LIGHTING AND THAT CAN BE UTILIZED AS AN EVENING EVENT SPACE AS WELL. AND THEN THAT TIES INTO THIS PORCH SLASH CANOPY THAT RUNS ALONG THE EDGE OF THE EXISTING GYMNASIUMS, ALL THREE ALLOWING THEM TO ACT AS A VARIETY OF DIFFERENT CIVIC FUNCTIONS AND WILL ALLOW IT TO BASICALLY BE UTILIZED FOR NOT ONLY PICKLEBALL COURTS, BUT OTHER EVENTS AS WELL.
AS WE BEGAN TO STUDY THE EXTERIOR PALETTE OF THE BUILDING.
AS YOU KNOW, ONE OF THE CRITICAL THINGS THAT WE RAN INTO IS JUST RECOGNIZING THERE WAS A NEED TO UPDATE THE BUILDING'S FACADE TO GET IT, TO GET IT TO BE SORT OF MORE MAINTAINABLE AND TO FUNCTION BETTER FROM AN ENVIRONMENTAL STANDPOINT.
[00:25:05]
MATERIALS THAT ARE CURRENTLY IN CITY CENTER AS WELL.AND THE VIEW HERE THAT YOU SEE IS THE NEW ENTRY TO THE COMMUNITY CENTER.
THIS IS ESSENTIALLY AT THE EXISTING ENTRIES LOCATION.
WE'RE UTILIZING A REALLY PRAGMATIC MATERIAL, REPLACING ESSENTIALLY WHAT WAS THERE AS A INSULATED WALL PANEL WITH A NEW WALL PANEL SYSTEM THAT'S SIMILAR TO IT, BUT UTILIZING TEXTURE TO CREATE SOME VARIETY AND A SLIGHT DIFFERENT COLORATION ALONG IT SO IT WILL HAVE SOME REFLECTIVITY, SOME MORE MODERN TAKE ON WHAT WAS EXISTING. BUT AS WELL, USING TEXTURE AND COLOR SHIFTS TO GIVE IT A LITTLE BIT MORE VISUAL VIBRANCY.
YOU CAN ALSO SEE THE MURAL THAT SETS ALONG THE BASE OF WHAT WAS AN EXISTING MECHANICAL ENCLOSURE.
AND THAT MURAL IS REALLY A GREAT OPPORTUNITY TO CREATE SORT OF A PHOTO, A PHOTO MOMENT, A WAY OF SORT OF GETTING MUCH CLOSER TO ART RATHER THAN HAVING IT SOMETHING THAT YOU CAN BE DETACHED FROM. AND THEN YOU'RE STARTING TO SEE AS WELL, THE CANDIDATE BE MOVING FROM THE OUTSIDE AND REINFORCING THE SENSE OF CONNECTIVITY.
MOVING CLOSER TO THE MAIN ENTRY, YOU CAN START TO SEE HOW THE BUILDING STARTED TO OPEN UP.
AND THEN ON THE RIGHT HAND SIDE, YOU CAN SEE THE FLEX/YOUTH EDITION PIECE AGAIN, WITH THE IDEA THAT IT WOULD BE A VERY SORT OF LARGE OPEN GLASS AREA THAT YOU CAN SEE INTO AND THAT THE PROGRAMING INSIDE BECAME A THING OR BECOMES A THING THAT'S REALLY ACCESSIBLE AND VISUAL FOR THE COMMUNITY.
YOU CAN SEE THE YOUTH PIECE TOWARDS THE FLEX PIECES, THE COPPER COLOR TOWARDS THE LEFT.
AND THEN AGAIN, REALLY TRYING TO REINFORCE THIS IDEA OF TRANSPARENCY AND CONNECTIVITY FOR THE SENIOR SPACES AS WELL, SO THAT, YOU KNOW, DAYLIGHT AND A SENSE OF WELLNESS IS REALLY IN INTEGRATED IN ALL OF THE THINKING THERE.
AND THEN THIS IS A VIEW LOOKING AT IT FROM OLD TOWN.
SO YOU CAN SEE THE METAL PANELS AND WRAPPING AROUND THE TOP OF THE EXISTING CMU.
WE ARE PAINTING THE EXISTING CMU THAT'S AT THE BASE.
AGAIN WITH THE IDEA THAT WE'RE CREATING THAT VISUAL CONNECTIVITY.
AGAIN, THIS IS AN OPPORTUNITY FOR US TO CREATE A PLACE THAT BECOMES A CIVIC DESTINATION, SOMETHING YOU CAN UTILIZE FOR A VARIETY OF FUNCTIONS THROUGHOUT THE YEAR, AND ESPECIALLY WHEN IT'S HOT AND SUNNY OUT, YOU'LL HAVE SOME SHADE PROTECTION AT THOSE IN THOSE AREAS AND YOU CAN KIND OF CATCH A GLIMPSE OF THE MURAL AT THE AT THE FAR END OF THAT.
THIS IS JUST A GENERAL FLOOR PLAN.
I'LL TALK QUICKLY ABOUT HOW IT'S ORGANIZED.
SO ON THE UPPER LEFT HAND CORNER IS THE EXISTING GYMNASIUM.
ON THE FAR RIGHT HAND CORNER ARE THE NEW SENIOR CENTER COMMUNITY SPACES.
THE TWO AREAS IN BLUE IN THE MIDDLE ARE BOTH ENCLOSED MEETING SPACES.
THERE ARE SORT OF FLEX MEETING SPACES FOR THE FOR THE COMMUNITY CENTER.
THE ONE ON THE SOUTH IS THAT YOUTH FLEX PIECE THAT WE WERE TALKING ABOUT EARLIER IN THE COPPER COLOR AND ON THE NORTH IS SORT OF A REPURPOSING OF THE EXISTING AV ROOM THAT'S THERE NOW.
AND WE'RE GIVING IT A LITTLE BIT OF DAYLIGHT INSIDE AS PART OF THE MODIFICATION.
AND THEN THERE'S SOME OTHER SORT OF EDITS THAT WE'RE DOING ALONG THE WAY FOR THE BACK OF HOUSE SPACES, ADDING SOME LOCKER ROOMS OR MODERNIZING THE LOCKER AREAS, THE RESTROOMS AND SOME OF THE KITCHEN AND ALONG THOSE AREAS.
THE FOCUS ON WELLNESS IS INTEGRATED INSIDE OF THE ENTIRETY OF THIS BUILDING.
WE ALSO WANTED TO BE JUST RESPONSIBLE IN TERMS OF HOW WE THOUGHT ABOUT MATERIAL SELECTION INSIDE TO MAKE SURE THAT WE'RE CREATING INDOOR AIR ENVIRONMENTS THAT ARE HEALTHY FOR BOTH THE YOUTH AND THE SENIORS.
[00:30:04]
THAT ARE HEALTHY AND DON'T REALLY RELEASE ANY SORT OF NASTY STUFF INTO THE ENVIRONMENT.AND THIS IS A VIEW OF LOOKING AT IT FROM THE LOBBY.
THIS IS THE ESSENTIALLY WHAT WAS THE EXISTING COMMUNITY CENTER ENTRY POINT.
YOU CAN START TO SEE HOW A NEW WELCOME DESK CREATES A STRONG VISUAL ANCHOR WITHIN THE SPACE AND THEN THAT SAME WELCOME DESK WILL LOOK DOWN THE CENTRAL CORRIDOR SO THAT IT CAN BE A MUCH STRONGER OPPORTUNITY TO CREATE SOME VISUAL SECURITY WITHIN THE INTERIOR AND CREATE A STRONGER SENSE OF VISUAL CONTROL.
WE'RE STILL WORKING ON EXACTLY HOW THE GRAPHICS WILL WORK ALONG THAT AREA, BUT THE AREA IN THE BACK WALL WRAPPING BEHIND THE WELCOME DESK AND AROUND THIS CORNER ARE OPPORTUNITIES FOR US TO THINK ABOUT JUST TREATMENT OF COLOR AND GRAPHICS AS PART OF THAT INTERIOR WALL TREATMENT.
SO THAT'S SOMETHING WE'RE CONTINUING TO EVOLVE A LITTLE BIT.
SO THE TWO TOP IMAGES REPRESENT IT'S SORT OF A YOUTH LIKE USAGE.
SO ON THE UPPER LEFT HAND CORNER, YOU CAN IMAGINE THAT SORT OF A DAY PLAY AREA, FLEX PLAY ZONE, THE AREA IN THE UPPER RIGHT THINKING ABOUT HOW IT COULD BE UTILIZED AS A SERIES OF ART CLASSES.
SO YOU CAN CERTAINLY FROM A MATERIALITY STANDPOINT, USE IT TO PAINT AND DO WHATNOT.
AND THEN REALLY THINKING ON THE BOTTOM THAT THIS CAN ALSO BE SORT OF AN AFTERNOON SLASH EVENING FUNCTION SPACE AS WELL, THAT IT'S A KIND OF VERY CHAMELEON LIKE AND IT CAN DRESS IT UP OR DRESS IT DOWN AS YOU NEED TO.
AND THAT IT CAN IT CAN SERVE THAT FUNCTION SIMULTANEOUSLY.
AND THEN THE LAST IMAGE HERE IS LOOKING AT IT FROM THE HASKINS LOBBY.
THIS IS THE SORT OF SENIOR CENTER PROGRAM COMPONENTS.
A FEW THINGS TO NOTE IN THIS VIEW IS WE'RE REALLY FOCUSED ON THIS IDEA OF TRANSPARENCY AND VISUAL CONNECTIVITY TO REINFORCE THE SENSE OF SOCIAL CONNECTIVITY WITHIN WHAT CAN BE A POPULATION THAT'S SOMETIMES ISOLATED, REALLY A FOCUS ON TRYING TO INTEGRATE DAYLIGHT NATURE AND VIEWS INTO THE INTERIOR ENVIRONMENT SO THAT IT'S BRIGHT, IT'S WELCOMING AND IT'S WARM, AND IT CREATES A NICE, STRONG VISUAL PLACE FOR, YOU KNOW, FOR SOMEBODY TO SPEND THE DAY AND THEN IN THE EVENING CAN AGAIN TRANSITION INTO OTHER FUNCTIONS IF NEEDED.
WITH THAT, I THINK THAT CONCLUDES THE DEVELOPMENT.
BEFORE YOU STEP AWAY, A COUPLE THOUGHTS.
I KNOW WE HAVE A GRADE CHANGE.
IF I'M. AM I READING THAT RIGHT? RESTROOMS ARE ON TWO LEVELS.
AND THAT COMES THROUGH THIS LITTLE PORTION RIGHT THROUGH HERE.
AND THEN THAT'S HOW THE SENIORS ACCESS THE LOWER RESTROOMS. OKAY. I SAW THE DOORS ON THE OTHER SIDE OF THOSE.
AND I'M THINKING, OKAY, ARE THEY HAVE TO GO UP THE RAMP TO GO? AND I'M THINKING, THAT MAKES NO SENSE.
SO AND THEN JUST BE CAREFUL AT THE END.
WE REFER TO THE HASTON'S LOBBY.
THAT'S A LONG TERM FAMILY NAME.
BUT WE DON'T NAME FACILITIES AND ROOMS. MAKE SURE YOU PUT IN THERE HASTON STREET OR THE SENIOR LOBBY OR SOMETHING OF THAT NATURE.
SO WE DON'T START TELEGRAPHING.
WE'RE NAMING THIS ROOM AFTER OLD NAMES AND CREATE ISSUES THAT WE DON'T WANT.
WE CAN DO THAT LATER IF WE DISCUSS THAT.
BUT MY FIRST THOUGHT WAS, OH, THAT'S TOO HASTON FAMILY ROOM, OR DO WE HAVE ONE OF THOSE NOW AS OPPOSED TO THE HASTON STREET ENTRY? OKAY. LET'S JUST AVOID RUMORS AND POTENTIAL THINGS THAT WE HAVE TO BACK AWAY FROM.
I WILL ALWAYS CALL IT. OKAY, CRAIG.
GO BACK TO YOUR AERIAL FOR THAT ONE.
TURN YOUR MIC ON, PLEASE. CRAIG.
SO WHEN I LOOK AT THIS, I SEE A BASKETBALL HOOP.
YES. AND AS POPULAR AS PICKLEBALL IS, YOU PUT A BASKETBALL HOOP THERE, AREN'T YOU INVITING SOME SORT OF CONFLICT BETWEEN PICKLEBALL PLAYERS AND BASKETBALL PLAYERS AND YOU HAVE BASKETBALL HOOPS INSIDE, SO THIS JUST LOOKS ODD TO ME. EXPLAIN THAT.
I THINK THE THINKING ON IT WAS THAT PROGRAMING AND SORT OF HOW IT'S ORGANIZED FROM A USAGE STANDPOINT WILL BE PARTIALLY ORGANIZED THROUGH THE OFFICE AREA AND THAT THE PURPOSE OF THE BASKETBALL GOAL WAS REALLY TRYING TO THINK ABOUT WHAT HAPPENS DURING DAY CAMPS WHEN KIDS ARE OUT THERE OR UTILIZING IT.
COULD YOU CREATE AN ALTERNATE FUNCTION FOR THE PICKLEBALL COURTS SO THAT THEY'D HAVE ONE MORE THING TO DO IF THEY'RE OUTSIDE THE DAY TIME? I THINK IT WAS REALLY JUST A FOCUS ON FLEXIBILITY MORE THAN ANYTHING.
[00:35:06]
OKAY. JIM YEAH.SO ONE REALLY NICE THING ABOUT THIS NEW DESIGN IS HOW MUCH LIGHT IT HAS IN AND A LOT OF WINDOWS.
THE OLD AB ROOM IS ONE OF THOSE SPACES THAT'S STILL SORT OF A LARGE OPEN SPACE.
THAT SOUTHWEST TURF AREA, IS THAT GRASS OR SYNTHETIC? IT'S GRASS. WHAT WAS YOUR THOUGHT ON THAT? I MEAN, WE HAVE SYNTHETIC UP BY THE BUILDING.
YOU KNOW, I REALLY LIKE THE SYNTHETIC TURF THAT WE HAVE OUT HERE BY THE REC CENTER AS AN AREA.
WHAT'S YOUR THOUGHT ON THAT? I WAS JUST GOING TO SAY IT'S IT'S BEEN REALLY A BUDGET DISCUSSION, HONESTLY, COUNCILMAN SO WE'D LOVE TO DO ARTIFICIAL TURF THERE.
WE MIGHT STILL BE ABLE TO DO THAT.
IT'S REALLY GOING TO COME DOWN TO WHAT DOLLARS WE HAVE AVAILABLE.
BUT RIGHT NOW IN THE BUDGET IS REGULAR TURF.
WHAT'S THE DIFFERENCE? WE'RE BACK TO THAT.
DO WE DO ONE SLIDE OR TWO SLIDES? BECAUSE I THINK BILL IS RIGHT.
AND IT'S JUST A GREAT SPOT FOR PICK UP ACTIVITY OF ALL AGES, LAWNS FULL OF CHIGGERS AND GRASS AND ISN'T REALLY USED FOR MUCH. AND MORE THAN LIKELY WE'LL BE OUT DOING GET OFF THE GRASS RATHER THAN HAVE AT IT.
WE DON'T WANT TO GO BACK AND DO IT LATER NECESSARILY, IF WE CAN DO IT NOW.
AND WHAT'S THAT? WHAT'S THAT NUMBER? I THINK WE CAN PRIORITIZE IT AND SEE WHAT WE DO TO GET IT.
AGAIN, WE'RE NOT A FINAL DESIGN.
WE HAVE A FINAL BUDGET NUMBER.
WE'RE FEELING PRETTY GOOD ABOUT THINGS, BUT THAT WAS ONE THING EARLY.
WE JUST THOUGHT, LET'S PUT THAT, LET'S NOT HAVE THAT IN THE BASE.
THAT'LL BE FINE. WE CAN DO IT.
WE AGREE WITH STAFF. WE'LL DO WHAT WE CAN TO PRIORITIZE THAT AND GET IT.
THE PROJECT BILL, IS THAT IT? YEAH. COURTNEY.
I TOO NOTICED THE BASKETBALL GOAL.
I'M HAPPY TO TALK ABOUT BASKETBALL.
THAT WAS THE STAFF. WE DROVE THAT AS A STAFF.
KIDS ARE JUST EVERYWHERE TRYING TO OCCUPY ANY SPACE THEY CAN DO A VARIETY OF ACTIVITIES.
THIS WAS, HEY, DURING THE DAY WHEN WE'RE RUNNING A SUMMER CAMP, WHAT ELSE COULD THEY DO BESIDES FOR KIDS PLAYING PICKLEBALL THERE? COULD WE COULD WE ORGANIZE A LITTLE GAME OF THREE ON THREE PLAY FOR US OR SOMETHING LIKE THAT? THAT GIVES THEM ANOTHER SPACE TO POTENTIALLY SHOOT SOME HOOPS.
AND SO MOST OF THE TIME THAT WOULD PROBABLY BE DEDICATED PICKLEBALL SPACE, BUT THAT DOES GIVE THE FLEXIBILITY FOR SUMMER PROGRAMS AND OTHER KID PROGRAMS THAT MAY BE GOING ON IN THE CAMPUS. SO OF COURSE, IT'S A IT'S A MINOR EXPENSE.
WE THINK IT GIVES US A LOT OF FLEXIBILITY.
AND I NOTICED IN THE PICTURES THAT IT WAS MORE JUST GLASS DOORS.
DO WE SWITCH THAT UP TO JUST BE MORE OPEN? IT WAS IT FELT MORE ENVIRONMENTALLY AND FROM A WEATHER STANDPOINT, MORE RESPONSIBLE FOR THE SPACES THAT IF WE JUST USE SIMPLE DOORS, THEY'RE EASY FOR THE STAFF TO MAINTAIN THEM.
LESS AIR WATER INTRUSION WILL OCCUR THROUGH THEM LONG TERM.
IT MAKES SENSE. I JUST NOTICED IT IN IT AS ONE OF THE CHANGES.
AND SO I JUST WANTED TO ADDRESS THAT.
AND I LOVE THE GLASS ON THE FLEX SPACE CHANGE.
I THINK IT LOOKS GREAT. AND THANK YOU FOR ALL YOUR HARD WORK, TOM.
AND YOU HAVE A WONDERFUL, WONDERFUL VOCABULARY OF DESCRIPTIVE WORDS AND ARCHITECTURAL TERMS.
[00:40:02]
I KIND OF GOT A KICK AT HOW THE JARGON KIND OF SNEAKS IN EVERY ONCE IN A WHILE, ESPECIALLY ON CMUS.I'D LIKE TO KIND OF KNOW HERE KNOWS WHAT A CMU IS.
THAT'S KIND OF WHAT'S LEFT OF OUR BUILDING FROM THE ORIGINAL.
AND YOU SAID YOU'RE PROBABLY GOING TO PAINT IT.
AND NOT ONLY TO TO PAINT IT, TO KNOW MAKE THE COLOR MORE CONGRUENT TO YOUR PALETTE THAT YOU'RE GOING TO BE INTRODUCING, BUT ALSO TO HELP SEAL IT AND LET IT CONTINUE ON FOR ANOTHER 50 YEARS.
AND BUT I REALLY ENJOY SEEING HOW THE DESIGN IS TIGHTENING UP HERE.
IT'S BECOMING A LITTLE BIT MORE IN FOCUS.
SO THANK YOU FOR YOUR WONDERFUL DESCRIPTION.
NO QUESTIONS FROM ME, BUT JUST COMMENTS.
I ALWAYS LOOK FORWARD TO HAVING YOU HERE AND SEEING THE ESTHETICS AND THE THE THE DESIGN PLANS.
I'M JUST REALLY EXCITED FOR FOR THIS TO OPEN UP.
AND AS I'M SURE YOU ARE, TOO, VERY MUCH LOOKING FORWARD TO IT.
AND NOT THAT I DON'T LIKE YOU CRAIG BUT THAT BASKETBALL HOOP KIND OF MAKES SENSE TO ME.
I LIKE IT. YEAH, WE CAN GO OUT THERE AND PLAY SOMETIME.
SO YOU MENTIONED THE FORMER MECHANICAL ENCLOSURE THERE ON THE CORNER.
CAN YOU JUST QUICKLY REVIEW WHAT PROGRAM OR SURFACE YOU'RE ADDING TO CREATE THE SURFACE FOR THE MURAL AND IF THAT ADDS ANY AMENITIES TO THE BUILDING, PLEASE. THE EXISTING MECHANICAL ENCLOSURE IS STILL THERE.
BUT WE'VE TAKEN SOME PRELIMINARY ANALYSIS IN TERMS OF WHAT THAT'S GOING TO TAKE.
CAN I GET FROM FULHAM TO HASTINGS THROUGH THIS PARKING LOT OR IS THAT A RAISED SIDEWALK OR ANYTHING THAT WE DON'T HAVE PEOPLE CUTTING THROUGH? I KNOW WE'RE DOING AS MUCH AS WE CAN TO MAKE IT NOT A STRAIGHT SHOT, BUT IS IT OPEN? IT IS AN OPEN PATHWAY.
HOWEVER, WE COULD DO SOMETHING AT THE ACTUAL WALK TO SLOW TRAFFIC DOWN.
I DON'T THINK WE SHOULD CLOSE IT, BUT I THINK WE NEED TO CONSIDER THE PEOPLE WALKING DOWN.
THANK YOU. I THINK WE HAVE A CONTRACTOR PRESENTATION.
RIGHT? GOOD EVENING, CITY COUNCIL.
MY NAME IS CHRISTY TURNER. I'M WITH TURNER CONSTRUCTION AND WE HAVE BEEN WORKING WITH YOUR DESIGN TEAM AND LOGAN AND BEN FOR THE LAST SEVERAL MONTHS TO REALLY PRESENT THIS TO YOU THIS EVENING.
AND THEN AN ULTIMATE PRESENTATION IN NOVEMBER, WHICH YOU'LL HEAR ABOUT IN A MINUTE.
YOU'VE MENTIONED A FEW THINGS TONIGHT.
THEY'VE MENTIONED A FEW THINGS TONIGHT THAT ARE STILL UNDERWAY AND STILL BEING CONSIDERED.
OVER THE COURSE OF THE LAST SEVERAL MONTHS, WE'VE ESTIMATED THE PROJECT A NUMBER OF TIMES.
OUR LAST ESTIMATE CAME IN ON BUDGET.
CONSTRUCTION TRADES WILL BE SUBMITTING THEIR BIDS BASED ON THOSE 100% CONSTRUCTION DOCUMENTS.
BETWEEN SEPTEMBER AND NOVEMBER.
WE'LL GET BIDS IN FOR ALL OF THE SCOPES.
SO AGAIN, OVER THE FALL, WE'LL BE BIDDING OUT ALL OF THE TRADES, ALL OF THE SCOPES OF WORK.
OUR PROCESS IS VERY OPEN BOOK.
FROM THERE, WE WILL PLAN TO MOBILIZE FOR CONSTRUCTION IN JANUARY.
WE'VE GOT THOSE EARLY ITEMS THAT WE'VE ASKED TO FOR APPROVAL TO THIS EVENING ON.
[00:45:04]
IT WOULDN'T MAKE SENSE FOR US TO START BEFORE JANUARY BECAUSE WE'D GET TO A POINT WHERE WE'D HAVE TO STOP AND WAIT FOR SOME OF THAT EQUIPMENT TO ARRIVE.WE ARE STILL PLANNING ON WRAPPING UP IN DECEMBER OF 24, AND WE WILL CONTINUE TO WORK WITH LOGAN AND BEN AND THE ENTIRE TEAM TO MAKE SURE THAT OUR CONSTRUCTION SCHEDULE TAKES INTO ACCOUNT ALL OF YOUR CITY EVENTS.
SO WE ARE WELL UNDERWAY WITH MAKING SURE THAT THOSE COORDINATION ITEMS OCCUR.
SO PROJECT MILESTONES, WHICH SOME OF THESE YOU'VE ALREADY SEEN THIS EVENING, THE CIP AMENDMENT AND THE AGREEMENT THIS EVENING, THE FINAL CONSTRUCTION DOCUMENTS IN GAP IN NOVEMBER, FULL MOBILIZATION FOR CONSTRUCTION IN JANUARY OF 2024.
AND THEN WE'LL BEGIN REALLY THAT MID ACT DEMOLITION.
AT THAT TIME, WE'LL BUILD THE NEW HASKINS ENTRANCE WING AS ONE OF THE FIRST PHASES BETWEEN JANUARY AND SEPTEMBER OF 2024 AND THEN RENOVATE THE SLUM ENTRANCE WING.
FROM THERE, WE'LL BE WORKING ON SEVERAL OF THE OTHER INTERIOR RENOVATIONS BETWEEN AUGUST AND NOVEMBER WHEN WE FINALLY BEGIN THE SENIOR CENTER DEMOLITION IN THE FALL OF 24, REALLY DOING ALL OF THAT EXTERIOR SITE WORK DURING THAT FALL TIME FRAME AND THEN GRAND OPENING IN DECEMBER.
THANK YOU. QUESTIONS OR THOUGHTS ON THAT? THANKS, CHRISTY. YEAH, NOTHING FUNNIER THAN SIN IN OUR SCHEDULE OF EVENTS AND LONG TERM RENTALS TO A CONTRACTOR.
IT'S LIKE A PAGE AND A HALF LONG.
YEAH, JUST INCORPORATE THIS INTO THE SCHEDULE.
NO PROBLEM. BUT NO, I WON'T SPEAK.
AND EVERYONE HERE IS READY FOR ANY QUESTIONS YOU MAY HAVE.
OTHER THAN THAT, WE'LL LOOK FOR APPROVAL FROM THE COUNCIL.
I'M SORRY. SAY THAT AGAIN. OKAY.
ANY QUESTIONS? NEED A MOTION TO APPROVE THE RESOLUTION APPROVING THE AMENDMENT TO THE 202327 CIP.
ANY OPPOSED, RESOLUTION IS APPROVED.
SECOND MOTION BY TOM SECOND BY WAS THAT JULIE.
JULIE ALL IN FAVOR? ANY OPPOSED? MOTION CARRIES AS THEY SAY.
LET'S GO. IT'S EXCITING THAT WE CAN GET THAT DONE WITHIN A ONE CONSTRUCTION SEASON.
SO AND LOGAN CAN BALANCE ALL THE FESTIVALS AND COMMITMENTS AND THEATER THAT GOES ON IN THE MEANTIME.
[COUNCILMEMBER REPORTS]
COUNCIL MEMBER REPORTS ANYONE.COURTNEY. I JUST WANT TO SAY THAT THANK YOU TO EVERYBODY WHO PUT IN ALL OF THE WORK AND EFFORTS TO MAKE SURE THAT THE OFFICER OSWALD'S MEMORIAL WENT WELL.
IT'S A BIG UNDERTAKING, AND ESPECIALLY DURING A REALLY TOUGH TIME.
SO I JUST WANTED TO SAY THANK YOU FOR THAT AND YOUR EFFORTS WERE APPRECIATED.
[STAFF REPORTS]
THEN WE HAVE. I'LL DO THE STAFF REPORTS.YES, WE HAVE ONE. WE HAVE A COUPLE OF ITEMS FOR YOU TONIGHT.
WE'LL START WITH AN OVERVIEW OF THE PROX INTERNSHIP.
AND WE HAVE JIM BOWERS AND BREE RHODES FROM HUMAN RESOURCES TO PROVIDE THAT UPDATE.
IN THE HR TEAM IT LOOKS LIKE IS BEHIND JIM.
WELL, THAT'S A THAT'S ANOTHER ITEM.
OH, OKAY. GOOD EVENING, MAYOR BOEHM AND MEMBERS OF COUNCIL JIM BOWERS, HR DIRECTOR WITH ME, AS BECKY SAID, IS BREE RHODES, ONE OF OUR HR SPECIALISTS.
SO YOU MIGHT ASK, WHAT IS PRO X? WELL, IT'S A PROGRAM WHERE KANSAS CITY METRO HIGH SCHOOL STUDENTS SPEND 25 HOURS A WEEK FOR FIVE WEEKS INTERNING WITH A LOCAL BUSINESS OR GOVERNMENT THAT THEY HAVE AN INTEREST IN PARTICIPATING.
[00:50:06]
OTHER THAN OUR TIME, THERE WAS NO COST TO THE CITY FOR HOSTING THESE STUDENTS.THE PROGRAM IS FUNDED BY CHERY COMPANY, A SPORTS FASHION BRAND FOUNDED BY CEO THALIA CHERY, A FORMER COLLEGIATE MULTI-SPORT ALL-AMERICAN WHO RESIDES IN KANSAS CITY.
WE FOUND OUT ABOUT PROX THROUGH MAYOR BOEHM, WHO IS AN ACQUAINTANCE OF MS. CHERRY, I BELIEVE THROUGH THE GREATER KANSAS CITY CHAMBER OF COMMERCE.
SO BREE RHODES WAS TASKED TO BE THE CITY'S PROGRAM COORDINATOR FOR PROX, AND SHE'S GOING TO RECAP THE DETAILS OF OUR FIRST EXPERIENCE WITH THE PROGRAM.
HELLO, MAYOR AND MEMBERS OF THE COUNCIL.
AS JIM MENTIONED, MY NAME IS BREE RHODES AND I'M AN HR SPECIALIST HERE AT THE CITY.
SO WE KICKED OFF THIS PROX INTERNSHIP AT A MARCH HIRING EVENT.
IT WAS AN ON THE SPOT HIRING EVENT.
IT WAS SET UP LIKE A CAREER FAIR SO THE STUDENTS COULD COME AND PICK AND CHOOSE THE AREA EMPLOYERS WHO THEY GOT TO MEET WITH OR RATHER INTERVIEW WITH SINCE IT WAS ON THE SPOT HIRING. SO THERE WERE 600 HIGH SCHOOL STUDENTS THAT WERE HIRED AT THIS EVENT BY 123 AREA EMPLOYERS.
SO WE HAD A GREAT GROUP OF FOUR INTERNS FROM LEFT TO RIGHT.
HERE WE HAVE KAVYA PATEL, MAC FIR, ISAIAH WALKER AND ASHLEY BROYLES.
SO WE HIT EVERY AGE GROUP WITH THEM.
SO AS MENTIONED, IT IS A FIVE WEEK PROGRAM AND WE DESIGNED IT AS A ROTATIONAL EXPERIENCE.
WE DID HAVE NINE CITY DEPARTMENTS PARTICIPATE AND HOST THESE INTERNS.
SO EACH SNIPPET HERE GIVES A LOOK INTO EACH WEEK THAT THEY SPENT WITH US.
IT DID RANGE AND VARY DEPENDING ON EACH DEPARTMENT OF HOW MUCH TIME THEY HAD WITH THESE INTERNS.
SO PARKS AND REC AND COMMUNITY DEVELOPMENT DID HOST THEM FOR AN ENTIRE WEEK WHILE THE REST OF US HOSTED THEM FOR EITHER A HALF A DAY, A FULL DAY, A COUPLE OF DAYS, THAT KIND OF THING. HERE ARE A FEW PHOTOS OF THE INTERNS TIME WITH US.
WE DID TAKE THEM TO GO SEE GOATS ON THE GO AND EXPLAIN THE HISTORY BEHIND THAT.
SO THAT WAS FUN TO HEAR ABOUT.
AND THEN THERE'S A PHOTO OF THEIR FIRST DAY TO THEIR LAST DAY.
SO AS YOU CAN SEE, THEY DID RATE US VERY HIGHLY THROUGHOUT THESE QUESTIONS HERE.
THEY FELT LIKE THEY LEARNED VALUABLE INFORMATION.
THEY NOW MIGHT BE INTERESTED IN CONSIDERING A CAREER IN THE PUBLIC SECTOR, AND THEY ALL STRONGLY AGREE THAT THE EMPLOYEES THAT THEY ENGAGED WITH WERE KNOWLEDGEABLE AND PROFESSIONAL. WHAT DID THEY LIKE MOST ABOUT THIS INTERNSHIP? THEY DID LIKE THE ROTATIONAL EXPERIENCE.
AND THEN ONE OF THEM SAID IT HELPED ME DECIDE WHAT CLASSES TO TAKE IN HIGH SCHOOL.
SO I FEEL LIKE AT THAT AGE, YOU NEVER REALLY KNOW WHAT YOU WANT TO DO.
SO THAT'S ALWAYS NICE TO BE ABLE TO HAVE SOME TYPE OF INFLUENCE THERE.
WHAT DID THEY LIKE LEAST? THEY DID SAY SOME MEETINGS WERE TOO LONG, MAYBE NOT ENOUGH TIME IN SOME DEPARTMENTS DUE TO IT BEING A SHORT SCHEDULE.
THEY DID HAVE TO DO A PRESENTATION, BUT THAT IS A PROX REQUIREMENT.
SO UNFORTUNATELY MY HANDS WERE TIED THERE.
HOWEVER, NEXT YEAR WE CAN LOOK INTO EXTENDING LUNCH BREAKS TO A LITTLE BIT LONGER THAN 30 MINUTES.
[00:55:04]
ALL OF THEM SAID THAT THEY WOULD RECOMMEND THIS INTERNSHIP TO OTHER STUDENTS.THEY REALLY SPECIFICALLY ENJOYED OUR ACTIVE COMMUNITY.
I THINK THEY WERE ALL VERY IMPRESSED WITH LENEXA AND HOW KIND EVERYONE WAS.
AND THEN ONE OF THEM SAID THAT THEY HAD ALREADY BEEN TALKING TO THEIR FRIENDS ABOUT IT.
SO JUST THE WORD OF MOUTH, I THINK, IS ALWAYS GREAT TO HEAR, TOO.
WE DID ASK FOR SUGGESTIONS, SUGGESTIONS AND FEEDBACK ON WHAT WE COULD DO BETTER FOR NEXT YEAR.
HOWEVER, I WOULD LIKE TO CALL OUT SOME TWO QUOTES HERE.
WITH THAT BEING SAID, I THANK YOU AND I'M TRULY GRATEFUL AND WILL CHERISH THIS OPPORTUNITY.
AND THEN ANOTHER ONE SAID, I LOVE THE FIRE DEPARTMENT.
IT MADE ME REALIZE THAT I WANT TO GO INTO THAT FIELD.
WE ALSO SURVEYED OUR MANAGERS BECAUSE WE WANTED TO MAKE SURE TO GET THEIR FEEDBACK AS WELL.
THEY WERE ENGAGED AND THEY WERE EAGER TO LEARN.
WHAT COULD WE HAVE DONE DIFFERENTLY? NEXT YEAR, WE DO PLAN TO KICK THINGS OFF WITH AN IN-DEPTH SESSION WITH THE CITY MANAGER'S OFFICE.
WE ALSO RECEIVED FEEDBACK TO GET THEM TO INTERACT WITH ELECTED AND APPOINTED OFFICIALS.
SO MAYBE WE'LL GET YOU ALL INVOLVED NEXT YEAR AS WELL.
I THINK WE COULD PREPARE BETTER FOR THIS AGE GROUP.
IN GENERAL, THEY WERE VERY QUIET.
BUT REGARDLESS, THEY WERE STILL INTERESTED AND EAGER TO LEARN.
AND THEN SOME OTHER LESSONS LEARNED IS MAKING IT MORE OF A TRUE INTERNSHIP.
BUT OVERALL, WE DO JUST WANT TO SAY THANK YOU.
THANK YOU, MAYOR BOEHM, FOR INTRODUCING US TO THIS PROGRAM.
YOU GUYS HAVE ANY QUESTIONS? JUST START BY SAYING THANK YOU.
HOPEFULLY YOU SAW THAT AS AN OPPORTUNITY TO CONNECT BACK TEN YEARS, IN SOME CASES 40 YEARS.
BUT SEE WHAT THE I DIDN'T CALL OUT NAMES.
JUST SEE WHAT'S COMING UP THE PIPELINE.
AND WE'RE STARTING TO HIRE THOSE YOUNG PEOPLE AS WELL.
SO THANK YOU. AND DALIA WAS REAL PLEASED WHEN THE CITY OF LENEXA AGREED TO JOIN.
AND I KNOW WE PROBABLY PROVIDED A MODEL OPPORTUNITY.
I'M CURIOUS, WHAT WAS THE PROJECT? HOW WAS IT DETERMINED AND? SO THE PROJECT IS A LESSON LEARNED.
BUT THEIR THEIR PROJECT WAS ABOUT TRYING TO REACH MORE STUDENTS TO COME AND WORK FOR THE CITY.
YEAH, I'M PRESUMING THE COACHES HAVE MULTIPLE BUILDINGS AND MULTIPLE PEOPLE.
SO YES, WE CAN TAKE WE CAN TAKE OWNERSHIP OF THAT AND THEY'LL SHINE.
ABSOLUTELY. WE DID LEARN ONCE IT STARTED THAT IT WAS ONE COACH TO 40 STUDENTS.
SO YEAH, THAT WAS A BIG, BIG RATIO FOR THEM.
COURTNEY I'M SOMEWHAT FAMILIAR WITH THIS PROGRAM.
JUST BECAUSE I WAS A HIGH SCHOOL TEACHER.
I DIDN'T EVEN KNOW WE DID THIS.
SO IT'S GREAT TO SEE IT ALL COME TO FRUITION ON THIS END.
[01:00:07]
I MEAN, OBVIOUSLY THERE'S SOME THERE WAS INTERVIEWING IN THAT FIRST DAY.INTERVIEWING THEY INTERVIEWED HOW MANY HOW MANY DID WE INTERVIEW TO GET? FIVE? WELL, WE DID TAKE THE FIRST FIVE, BUT THEN WE HAD A REALLY LONG LIST OF LIKE A WAIT LIST TO BE ABLE TO CALL ON IF ANY OF OUR STUDENTS FELL OUT DURING THAT SUMMER TIME, WHICH WE DID HAVE ONE, BUT WE WEREN'T MADE AWARE UNTIL THE FIRST DAY.
SO WE DIDN'T PLUG INTO THAT WAIT LIST.
SO, YOU KNOW, WHETHER IT'S BECAUSE THE LINE WAS SHORT OR I'M NOT SURE, BUT YEAH, THEY CHOSE US AND THEN THEY CHOSE WE DID END UP WITH A LINE.
OH, THAT'S RIGHT. YEAH. IT TOOK A LITTLE BIT.
IS THAT THE WHOLE MAYOR? I JUST WANT TO SAY I REALLY WANT TO EXPRESS APPRECIATION TO BREA.
AS YOU MENTIONED, YOU GAVE THIS TO US AND SAID, LOOK INTO IT.
I, IN TURN GAVE IT TO THEM AND SAID, LOOK INTO IT, SEE WHAT YOU THINK.
AND BREA REALLY TOOK IT AND RAN WITH IT.
WE HAD NO IDEA, YOU KNOW, WHAT IT WOULD ENTAIL.
AND SHE DEVELOPED THE WHOLE PROGRAM.
AND BREA IS A RELATIVELY NEW EMPLOYEE WITH US AS WELL.
SO SHE WAS LEARNING ALONG THE WAY.
THANKS TO YOU FOR THAT AND TO THE DEPARTMENTS WHO PARTICIPATED, BECAUSE IT IS IMPORTANT THAT WE GET PEOPLE INTO PUBLIC SERVICE AND YOU GOT TO START, YOU KNOW, AS YOUNG AS POSSIBLE TO DO THAT.
THANK YOU. THE SECOND ITEM IS I'M SORRY, ARE YOU READY FOR ME? I WAS GOING TO ANNOUNCE THERE'S ANOTHER ITEM, SO GO AHEAD.
THE SECOND ITEM THAT WE WANTED TO TALK ABOUT TODAY IS JIM AND HIS TEAM HAVE BEEN WORKING ABOUT ON THE EMPLOYEE EXPERIENCE, REALLY FROM ATTRACTING PEOPLE TO PUBLIC SERVICE, LIKE YOU JUST HEARD, TO WHAT IT'S LIKE TO, YOU KNOW, YOUR EXPERIENCE ONCE YOU GET TO THE CITY.
AND ONE OF THE THINGS THAT THEY'VE DEVELOPED IS A WORKPLACE BUDDIES PROGRAM.
AND SO JIM'S GOING TO TALK ABOUT THAT FOR A MINUTE.
AND I THINK WE'RE GOING TO HAVE THESE FOLKS INTRODUCE THEMSELVES.
SO I JUST WANT TO INTRODUCE AGAIN, I THINK SHE'S BEEN HERE BEFORE FOR YOU, BUT APRIL BERETTA, ONE OF OUR HR PARTNERS, DEVELOPED THIS IDEA AS A PART OF OUR EMPLOYEE ONBOARDING AND THE EMPLOYEE EXPERIENCE THAT WE'RE WORKING VERY.
HARD ON TO ATTRACT AND RETAIN GREAT EMPLOYEES.
SO, APRIL. GOOD EVENING, MAYOR.
OH, HERE. OH, I THINK I'M OKAY.
HERE WE GO. OR DO YOU WANT TO BE ABLE TO SEE.
I WANT TO BE ABLE TO SEE YOU. OH, THAT'S GOOD.
WELL, GOOD EVENING, MAYOR AND COUNCIL MEMBERS.
YES, I DO WANT TO INTRODUCE THE EMPLOYEES BEHIND ME HERE.
THEY ARE PART OF THE WORKPLACE BUDDY PROGRAM.
WE CREATED THE PROGRAM TO HELP WELCOME NEW HIRES TO THE CITY.
AND BY HAVING CITY EMPLOYEE BE THE WORKPLACE BUDDY AS A SINGLE POINT OF CONTACT TO ANSWER QUESTIONS AND TO INTRODUCE THEM TO OTHER EMPLOYEES IN THE CITY. SOME OF THE BENEFITS THAT WE HOPE TO GAIN FROM THIS PROGRAM AGAIN, IT'S RECENTLY DEVELOPED HERE WITHIN THE LAST YEAR, BUT THE BENEFITS FOR THE NEW EMPLOYEE IS THAT INSTANT CONNECTION BUILDING RELATIONSHIPS, HAVING THAT SUPPORT AND GUIDANCE AND FRIENDSHIP FROM A WORKPLACE BUDDY.
WE ALSO HOPE THAT FOR THE CITY, GAINING THE BENEFIT FROM THIS PROGRAM IS INCREASED EMPLOYEE MOTIVATION, RETENTION, COMMUNICATION AND RELATIONSHIP BUILDING ACROSS DEPARTMENTS.
I ALSO WANT TO THANK EMILY SEMADENI.
AND JEN MARTIN AS WELL IS ONE OF THE WORKPLACE BUDDIES.
SO THANK YOU TO YOU GUYS FOR COMING AND BEING HERE.
SURE. WOULD YOU GUYS LIKE TO STAND UP AND INTRODUCE YOURSELVES REAL QUICK? ORGANIZER. DO YOU WANT TO TELL US HOW TO? HE'S AT THE END OF THE LINE, SO.
BRANDON MCELHANEY, ENGINEERING.
I'M THE BUDDY, AND HE'S THE NEW EMPLOYEE.
OKAY. SO I'M JEN MARTIN, AND I'M THE BUDDY AND JUSTINE IN FINANCE AND [INAUDIBLE] ARE MY BUDDIES.
EMILY SEMADENI. AND COURTNEY IS MY BUDDY.
[01:05:02]
SO LISA ROBERTS AND MY BUDDY.WELL, I AM THE BUDDY AND SHE IS MY BUDDY.
AND HEATHER HOWELL IS WITH ME ALSO IN HR.
FEW MORE THAT COULDN'T BE WITH US THIS EVENING.
THANK YOU. THE LAST THING I HAD TONIGHT, MAYOR, IS TO TURN MY MIC BACK ON AND REMIND YOU THAT WE HAVE OUR BUDGET OPEN HOUSE THIS THURSDAY FROM 5 TO 7 HERE IN THIS ROOM AND IN THE LOBBY.
SO I'M SURE WE'LL HAVE A FULL HOUSE AND WE'LL HAVE A FULL REPORT FOR YOU ON FRIDAY ABOUT THAT.
I SAW THAT ONLINE THAT SAID WEDNESDAY AT ONE POINT.
IT HAS BEEN CORRECTED. NOT SURE OF THE ORDER, BUT.
AND THEN I'M NOT SURE ANYBODY KNOWS THIS OR NOT, BUT I'M SURE YOU'RE WELCOME.
TOMORROW, LEARNING ABOUT LENEXA FOR OUR STAFF, WE HAVE 50.
WE ARE DOING A NEW FIRST TIME EVER LEARNING ABOUT LENEXA EMPLOYEE EDITION TOMORROW AT NOON.
FOR THE MOST PART, I'VE BEEN ABLE TO CONTROL OR KEEP ORGANIZED THE THIRD GRADERS I MAY NEED HELP WITH STAFF, AND BETTY IS GOING TO STAND OVER ONE SHOULDER AND DON IS GOING TO STAND OVER THE OLDER AND WE'RE GOING TO TRY TO WE DO HAVE 75 PEOPLE SIGNED UP NOW.
SO COME ON OUT IF YOU HAVE A CHANCE.
IT'S THE FIRST TIME. SO I THINK THAT'S THE END OF OUR RECORDED SESSION.
IF THERE'S NOTHING ELSE TO BE SAID TONIGHT ON THAT PART.
* This transcript was compiled from uncorrected Closed Captioning.